Similar Projects
Air Conditioning and Quality Improvements Package 1 - 2022 Bond - Lansing School District
Alteration
Design
$4,100,000 est. value
Lansing, MI

Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

J.W. Sexton High School 2022 HVAC Control Upgrades - Bid Package 2
Alteration
Bidding
$260,000 est. value
Lansing, MI 48915

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

HVAC and Mechanical Products
Term Contract
Post-Bid

Beekman Center Condensing Unit Upgrade
Results
Lansing, MI 48910

Jan-Records Building-Replace North Ahus (1-4)
Results
Lansing, MI

Owen Graduate Hall - Implement Energy Conservation Measures
Post-Bid
East Lansing, MI

Bipolar Ionization System Installation
Results
East Lansing, MI

Connection To Chemistry To Retire Chillers 1 & 2
Post-Bid
Mason, MI

Abate and Pressurize Stairwells and Lobby Heating
Results
Lansing, MI 48933

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace HVAC System - Lottery Building
Results
Lansing, MI 48933

RTU Replacements
Alteration
Post-Bid
Lansing, MI 48910

HVAC Controls Systems
Alteration
Results
Lansing, MI

Last Updated 07/04/2022 12:51 AM
Project Title

Replace Cooling Tower, Piping and Associated Equipment - Romney Building

Physical Address View project details and contacts
City, State (County) Lansing, MI 48933   (Ingham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the entire cooling tower system: Option 1 - replace the two existing cooling towers, associated piping, pumps, valving and equipment along with an existing flat plate heat exchanger and condensate piping. Option 2 - investigation into utilizing chilled water from the Board of Water & Light: availability of the utility, the necessary equipment and associated cost. Project to include Phase 300, Schematic Design and Phase 500, construction documents. The PSC will be responsible to run all design meetings and provide notes for each meeting. There shall be a 50% and 90% review meeting minimum for Phases 300 and 500. The PSC will be responsible to submit to LARA etc. with fees under reimbursables. The PSC will be responsible to conduct construction progress meetings twice per month and complete field inspections on the same day if applicable for the duration of the project. Detailed cost estimates will be required at each 90% phase review meetings. General AutoCAD files will be available to the awarded PSC.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents