Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Gisler Avenue Landscape Improvements - City of Costa Mesa
Infrastructure, Alteration
Conception
$350,000 est. value
Costa Mesa, CA 92626

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

FY 2021-22 Annual Pavement Preservation Project (Zone 6)
Infrastructure
Post-Bid
$6,220,000 CJ est. value
Yorba Linda, CA 92886

Visitors Center Plaza Renovation and Site Utility Infrastructure Upgrades
Infrastructure, Renovation
Post-Bid
$5,723,000 CJ est. value
Irvine, CA 92618

First Street Slope Stabilization Project (Rebid2)
Infrastructure
Results
$4,482,892 CJ est. value
Santa Ana, CA 92701

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

Audi/Volvo Service Center
New Construction, Infrastructure - 14,720 SF
Pending Verification
$3,300,000 CJ est. value
Mission Viejo, CA 92692

Adams Avenue Bicycle Facility - Fairview Road to Harbor Boulevard - City of Costa Mesa
Infrastructure
Conception
$1,500,000 est. value
Costa Mesa, CA 92627

Placentia Avenue Stormwater Quality Trash Full-Capture System - City of Costa Mesa
Infrastructure
Design
$350,000 CJ est. value
Costa Mesa, CA 92627

Live Oak Trail Storm Drain Project
Infrastructure
Post-Bid
$143,000 CJ est. value
Yorba Linda, CA 92886

Last Updated 09/18/2023 10:14 AM
Project Title

Center for Leadership Building

Physical Address View project details and contacts
City, State (County) Fullerton, CA 92832   (Orange County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $2,237,620 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 18, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Liquidated Damages: $5,000.00 Project Durations:380 Calendar Days License Requirements: B The Project generally consists of a new 19,300 GSF donor-funded building for Leadership Training will to be located on Folino Drive, at the northeast corner of Mihaylo Hall. The building is to feature an Auditorium, Library and Archive, TV Studio, Boardroom, Training Room, and guest and staff offices. It will accommodate the centers initiatives including: visiting speakers, awards ceremonies, and professional consulting, as part of a broader vision for the next chapter of the College of Business and Economics as it continues to serve the community through transformative education, research, and engagement. The project is currently in schematic design, and the design firm is Steinberg Hart. Direct any prequalification questions to the Trustees Prequalification Administrator at cocm.prequal@calstate.edu. The Trustees shall give a small business a bid advantage of five percent to contracting firms that have been certified as a Small Business by the Department of General Services, Office of Small Business and DVBE Services, in accordance with Contract General Conditions (and Supplementary General Conditions) for Construction Manager at Risk with Guaranteed Maximum Price Projects, Article 2.08, Small Business Five Percent Bid Advantage. Additionally, the Trustees require three percent Disabled Veteran Business Enterprise (DVBE) participation in all contracts, in accordance with Contract General Conditions (and Supplementary General Conditions) for Construction Manager at Risk with Guaranteed Maximum Price Projects, Article 2.09-g, DVBE Incentive.

Details

19,300 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents