Similar Projects
Ringling College of Art & Design - Dining Facility
New Construction - 30,000 SF
Conception
$11,000,000 est. value
Sarasota, FL 34234

Rasmussen College
Renovation - 44,000 SF
Conception
Odessa, FL

USF Wellness Center Complex Phase 1
Design
Less than $20,000,000 est. value
Tampa, FL

Hobe Sound Bible College Gymnasium
Addition - 13,500 SF
Design
Hobe Sound, FL 33455

Gator Village aka Honors Residential College
New Construction
Bidding
$225,000,000 est. value
Gainesville, FL

FPU Applied Research Center Construction
New Construction - 85,100 SF
Sub-Bidding
$30,000,000 est. value
Lakeland, FL 33805

Miami Dade College North Campus Artificial Intelligence Center
Sub-Bidding
$2,950,000 to $3,185,000 est. value
Miami, FL 33132

FAMU Student Affairs Center for Access and Student Success
Post-Bid
Less than $26,000,000 est. value
Tallahassee, FL

Student Union Replacement
New Construction - 270,000 SF
Post-Bid
Less than $100,000,000 est. value
Tallahassee, FL

Construction Manager for the Renovation of Radio Station WQCS (Building Q) & Replacement of the Industrial Building (Building O)
Results
Fort Pierce, FL 34945

Roth Athletic Center (Wayne Densch Building 77 Expansion)
Build-Out - 40,000 SF
Results
$5,000,000 est. value
Orlando, FL

Hoffman Teaching Lab Renovations
- 79,500 SF
Construction
$7,500,000 to $10,000,000 est. value
Tallahassee, FL 32304

The Malachowsky Data Sciences and Information Technology
- 260,000 SF
Construction
Less than $135,000,000 est. value
Gainesville, FL

University Station Hollywood - Master Plan
New Construction, Build-Out - 11,000 SF
Conception
$40,336,400 est. value
Hollywood, FL 33020

CM at Risk Services for Deferred Maintenance Projects - Wolfson Campus
Design
$7,000,000 to $10,500,000 est. value
Miami, FL 33132

Last Updated 01/07/2020 08:16 AM
Project Title

Integrated Watershed and Coastal Studies (Academic Building 9)

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33965   (Lee County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected second quarter 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $50,000 to $57,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be located on the FGCU main campus. The building will contain classrooms, teaching laboratories, research laboratories, offices and other support spaces with a total area of approximately 116,505 gross square feet.

Details

College/University, 117,000 SF New Construction, Building.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents