Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Derecho Sidewalk, Driveway and Miscellaneous Pavement Repair Project
Infrastructure
Bidding
$350,000 est. value
Cedar Rapids, IA

Public Housing Pavement Repair
Infrastructure
Bidding
$147,000 est. value
Iowa City, IA

FY2021 Sidewalk and Trail Repair Program Zone 1
Infrastructure
Post-Bid
Waterloo, IA 50703

Hughes Park Phase II Improvements
New Construction
Post-Bid
Cedar Rapids, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Riverwoods Single Family & Townhome Develompent
New Construction
Pending Verification
Des Moines, IA 50320

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Curb Ramp 2021
Infrastructure
Bidding
$165,000 est. value
Iowa City, IA

Barrett Park Natural Playscape
New Construction
Post-Bid
$500,000 est. value
Urbandale, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

River Heritage Park Phase III
New Construction
Bidding
Davenport, IA

Last Updated 06/17/2021 12:03 PM
Project Title

Valley Junction Levee Trail Connection

Physical Address View project details and contacts
City, State (County) West Des Moines, IA   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements generally described as follows: The construction includes approximately 290 square yards (SY) of sidewalk/driveway/trail removal, 225 Linear Feet (LF) of curb and gutter removal, 270 Cubic Yards (CY) of excavation, 2000 SY of 6” reinforced trail, 330 SY of driveway pavement, 225 LF of curb and gutter, 20 SY of 7” HMA pavement, railroad flaggers, fixture adjustments, restoration, survey, traffic control, and other associated work.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents