Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

Valley Junction Levee Trail Connection
Infrastructure
Bidding
West Des Moines, IA

Trailhead Plaza at Creekside Cross and Flow Trails
Infrastructure
Bidding
Coralville, IA 52241

2021-22 Water Main Improvements
Post-Bid
$4,473,470 est. value
Bedford, IA

Gilbert Court Sidewalk Infill
Post-Bid
Iowa City, IA

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Ludland Drive Street Repair
Results
$64,079 est. value
Manchester, IA

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

Public Housing Pavement Repair
Infrastructure
Bidding
$147,000 est. value
Iowa City, IA

Prairie City Water System Improvements - Phase 1
Infrastructure
Post-Bid
$1,080,000 est. value
Prairie City, IA

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Columbus Park Shelter and Police Station Parking Lot Improvements
Infrastructure
Bidding
$710,000 est. value
Des Moines, IA 50315

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Post-Bid
Waterloo, IA

Last Updated 06/09/2021 08:09 AM
Project Title

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street

Physical Address View project details and contacts
City, State (County) Prairie City, IA 50228   (Jasper County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $510,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements in this project include approximately 1,485 SY of 9” PCC, 1,060 SY of 7” PCC, 813 SY of Sidewalk, 83 SY of PCC Driveway, 210 LF of 12” diameter storm sewer, 2 storm intakes and 1 storm manhole, 443 LF of 8” water main, 1 fire hydrant assembly, 4 water service crossovers, and associated fittings and appurtenances. Other associated improvements include traffic control, pavement markings, erosion control, surface restoration, and miscellaneous work necessary to complete the project. {}This project is generally described road demolition and construction along Marshall Street from Washington Street to Jefferson Street, including the intersection of Marshall Street and Jefferson Street.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents