Similar Projects
11th Avenue South East and 5th Street Sanitary Sewer and Storm Sewer Improvements
Conception
$110,000 est. value
Cedar Rapids, IA 52407

A Street South West from 1st Street to Bowling Street Sanitary Sewer Lining
Conception
$4,000,000 est. value
Cedar Rapids, IA 52404

Sewer Lateral Program FY22
Infrastructure
Bidding
Davenport, IA

Oak Park Boulevard Sanitary Sewer Replacement
Infrastructure
Bidding
$545,000 est. value
Cedar Falls, IA 50613

2021-22 Water Main Improvements
Post-Bid
$4,473,470 est. value
Bedford, IA

2021 CIPP Sanitary Sewer Lining
Post-Bid
$542,510 est. value
Earling, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Lew Clarkson Park Softball Complex Improvements
Renovation
Results
$570,000 est. value
Johnston, IA

Edgewood Road (W/O) Prairie Creek (S/O) Sanitary Sewer Extension
Conception
$1,500,000 est. value
Cedar Rapids, IA

Nevada Avenue Sanitary Sewer Replacement
Infrastructure
Bidding
Less than $462,000 est. value
Iowa City, IA 52240

20th Street NE East of B Avenue Sanitary Sewer Extension
Post-Bid
$120,000 est. value
Cedar Rapids, IA

E Avenue North East from 19th Street to 20th Street
Conception
$1,650,000 est. value
Cedar Rapids, IA 52402

Prairie City Water System Improvements - Phase 1
Infrastructure
Post-Bid
$1,080,000 est. value
Prairie City, IA

15th Avenue South West from 4th Street to C Street
Conception
$1,707,000 est. value
Cedar Rapids, IA 52404

Grand Avenue West Segment 5B and 7A Sewers
Infrastructure
Post-Bid
West Des Moines, IA

Last Updated 06/08/2021 11:57 AM
Project Title

8th Street SE Water and Sewer Extensions

Physical Address View project details and contacts
City, State (County) Altoona, IA   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,463,902
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes approximately 3113 LF of 8” PVC SDR 26 sanitary sewer main, 10 SW-301 48” Dia manholes, 1 external drop connection, 3568 LF of trenched 16” PVC C900 RJ water main, 371 LF of trenchless directionally drilled 16” PVC C900 RJ water main, 10 each fire hydrants, associated water valves and water services, 272 LF pipe culverts, driveway removals and replacements, clearing and grubbing, SWPPP controls, seeding and mulch, and temporary barrier rail.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents