Similar Projects
Aggie Square at UC Davis - Phase 2
New Construction
Conception
Sacramento, CA 95817

UC Berkeley Upper Hearst & Goldman School of Public Policy
New Construction
Conception
Berkeley, CA 94720

San Jose City College Career Education Complex
New Construction, Renovation - 125,000 SF
Design
$112,000,000 est. value
San Jose, CA 95128

Aggie Square at UC Davis - Phase 1
New Construction
Design
Sacramento, CA 95817

CSU San Marcos - General Construction
New Construction
Bidding
Less than $752,000 est. value
San Marcos, CA

Magnolia Mansion Renewal
Renovation
Bidding
$3,984,000 est. value
Stockton, CA 95202

FANUC Robot Tabletop Systems
Renovation, Alteration
Post-Bid
Bakersfield, CA 93314

Design-Build Services for the Kennedy Library Renovation
New Construction, Renovation
Post-Bid
$55,000,000 est. value
San Luis Obispo, CA 93405

Design-Build Project-Tech Park Phase 2
New Construction
Results
$6,750,000 est. value
San Luis Obispo, CA 93405

Task Order Construction Agreement for Multiple Projects
New Construction
Results
Sacramento, CA 95819

UC Hastings College of Law Campus Housing
New Construction - 356,000 SF
Construction
$40,000,000 est. value
San Francisco, CA 94102

Porterville College Allied Health Building Project
Renovation
Construction
$14,856,000 est. value
Porterville, CA 93257

Caltech Resnick Sustainability Resource Center
New Construction - 80,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Pasadena, CA 91125

California College of the Arts Design Campus
New Construction
Pending Verification
San Francisco, CA

Helen Baszucki Center for Nursing Excellence School
New Construction
Conception
Less than $3,000,000 est. value
Monterey, CA

Last Updated 03/29/2022 05:10 PM
Project Title

UC Hastings McAllister Tower

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94102   (San Francisco County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method General Contractor to Subcontract.
Project Status Conceptual Design, Construction Start Expected first quarter 2023, Construction Completion Expected first quarter 2025
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation & Structural Upgrade

Details

College/University, 28 Stories Above Grade, 641,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls, Elevator Equipment, Elevator Safety Equipment, Elevator Hoistway Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents