Reported 11/13/2020 12:00 AM
Project Title

Edgelawn Bikeway Project Phase 3 Construction Engineering Services

Physical Address View project details and contacts
City, State (County) Aurora, IL 60505   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $408,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Edgelawn Drive is a major collector with either 2 lane section or 4 lane section that runs in the north south direction. The project’s north south limits are between Indian Trail and Virgil Gilman Trail, the project extends east on Prairie Street, north on LeGrande Boulevard, and west on Garfield Avenue, north on Gladstone Avenue and terminates at the intersection of Gladstone Avenue and Galena Boulevard. An onstreet bikeway is proposed as part of the improvement and consists of 5’ wide dedicated bike lanes, shared lane markings (Sharrows), 7’ wide striping that includes both parking and bike route, thermoplastic pavement markings, crosswalks, wayfinding signage, regulatory and warning signage. Portion of the project also involves extending the shoulders (widening the roadway) on Edgelawn Drive between Prairie Street and Virgil Gilman Trail to accommodate a 5 feet wide bike lane on the east side of the street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents