Similar Projects
Last Updated | 04/01/2021 09:51 AM |
Project Title | Fabyan Parkway Multi-Use Path Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Geneva, IL 60134 (Kane County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | HMA Path Removal and Reconstruction, HMA Path Pulverization and Overlay. Pavement Removal (2,991 Sy), Aggregate Base Course Ty b 6" (3,202 Sy), Hma Surface Course Il-9.5 Mix d n50 (766 Ton), Pulverization (1,296 Sy), Pcc Sidewalk 5" (189 Sf), Pcc Driveway Pavement 8" (172 Sy), Earth Excavation (499 Cy), Pedestrian Push Button Post Ty 1 (2 Each), Concrete Foundation Type a (8 Foot), Ped Signal Head Led 1 Face Bracket Mounted w/Cd Timer (2 Each), Ped Push Button (2 Each), Etc. The work shall consist of the multi-use path reconstruction and resurfacing. The removal of the existing multi-use path, the installation of a hot-mix asphalt multi-use path, aggregate base course, landscape restoration, and ADA upgrades shall be completed at the locations shown on the plans. In addition, the existing multi-use path adjacent to Settlers Hill Golf Course shall be pulverized and overlaid with hot mix asphalt, at the location shown on the plans. Also included is the removal of the existing pedestrian push buttons / pedestrian signal heads, the installation of new pedestrian push buttons located on push button posts, and pedestrian countdown signal heads. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |