Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadway Rehabilitation (3R)
Alteration
Design
$14,173,000 est. value
Coarsegold, CA

Domestic Water Piping Retrofit for Chowchilla Police Department
Infrastructure
Bidding
$150,000 CJ est. value
Chowchilla, CA 93610

RFQ D/B - Madera County Department of Public Health Playground and Shade Structures Project
Infrastructure
Bidding
$125,000 CJ est. value
Madera, CA 93638

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Cold Plane AC, Place RHMA-G and HMA (Type A)
Infrastructure
Post-Bid
$2,150,000 est. value
CA

CA FLAP MAD CR26(1) ET AL Avenue 26 and Road 29
Infrastructure, Alteration
Results
$16,000,000 to $21,000,000 est. value
Madera, CA

RHMA and HMA Paving, Modify Signal and Lighting Systems
Infrastructure
Results
$1,470,000 est. value
Madera, CA

Full Throttle Suspension Warehouse Building / Madera
New Construction, Infrastructure - 111,000 SF
Pending Verification
$12,000,000 CJ est. value
Madera, CA 93637

Full Throttle Suspension Warehouse Building / Madera
New Construction, Infrastructure - 111,000 SF
Pending Verification
$12,000,000 CJ est. value
Madera, CA 93637

Madera County Jail Annex Demolition
Demolition, Infrastructure - 11,620 SF
Design
$81,889 CJ est. value
Madera, CA 93637

CA Flap 03S11(1) Reds Meadow Road
Term Contract
Post-Bid
CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Minor B Small Business Remove and Replace HMA
Infrastructure
Post-Bid
$221,000 est. value
CA

2022 Countywide Pavement Rehabilitation and Overlay
Infrastructure
Results
$8,754,898 est. value
CA

Last Updated 08/23/2022 11:34 AM
Project Title

Bike/Ped Path, FRT-Cleveland Avenue - PK-00056 - City of Madera

Physical Address View project details and contacts
City, State (County) Madera, CA 93637   (Madera County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $310,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct bike/pedestrian path in MID alignment north of Fresno River to Cleveland Avenue between Granada Dr. and Schnoor Ave. This project is currently in the City of Madera's FY 2021-2025 CIP. As of August 23, 2022, funding for this project is allotted in the city's capital improvement plan for Fiscal Year 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents