Similar Projects
Last Updated | 02/08/2022 12:32 PM |
Project Title | Water Main Replacement Case, Center and Holabird Areas |
Physical Address | View project details and contacts |
City, State (County) | Winchester, CT (Litchfield County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work under this contract includes, but is not necessarily limited to, the installation of approximately 3,300 linear feet of new 8-inch ductile-iron water main on Center Street between Elm Street and Case Avenue, Case Avenue between Main Street (Route 44) and Gay Street, and Holabird Avenue between Whiting Street and Florence Street intersections. The work also includes the installation of approximately 900 linear feet of new 6-inch ductile-iron water main on Thibault Avenue between Elm Street and Greenwoods Avenue and on Greenwoods Avenue between Thibault Avenue and Gay Street intersections. The project also includes the removal of the existing water main, installation of new hydrants, valves, water service connections, temporary bypass piping, trench pavement, and mill and overlay within the state-owned road. This includes all work for the base bid and bid alternates. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |