Similar Projects
James Brown Arena
New Construction
Conception
$170,000,000 est. value
Augusta, GA 30901

Cairo High School - Stadium Restrooms
Renovation
Bidding
Cairo, GA

North Cobb High School Baseball Press Box Remodel
Post-Bid
Kennesaw, GA 30144

Duluth High School - Softball Stadium and Site Preparation
Post-Bid
Duluth, GA 30096

Henderson Stadium Renovation
Renovation, Addition
Results
Macon, GA 31206

State Mutual Stadium Improvements
Results
Less than $2,000,000 est. value
Rome, GA 30161

Savannah Arena
New Construction - 149,000 SF
Construction
$165,000,000 est. value
Savannah, GA

Forsyth Central High School Stadium Additions and Modifications
Addition
Construction
Less than $4,777,836 est. value
Cumming, GA 30040

New Construction of Villa Rica High School Football Stadium
New Construction
Post-Bid
Less than $6,800,000 est. value
Villa Rica, GA 30180

New East Laurens High School Campus and Football Stadium - CM at Risk Services
New Construction
Results
Less than $34,000,000 est. value
Dublin, GA

Concessions and Restroom Facility and Other Improvements to the Poplar Springs Baseball Complex
New Construction - 2,357 SF
Post-Bid
Ringgold, GA 30736

(ESPLOST) Savannah High School Stadium
New Construction
Results
Savannah, GA 31404

New Athletic Field Stadium for Dalton Public Schools
New Construction
Post-Bid
Dalton, GA 30721

Center Parc Stadium SE Loge Renovation
Renovation
Post-Bid
$200,000 est. value
Atlanta, GA 30315

BSC Maintenance Building Replacement
New Construction
Post-Bid
Bogart, GA 30622

Last Updated 12/04/2019 02:54 PM
Project Title

Construction Management at-Risk (CM/GC) Services - Russ Chandler Baseball Stadium Renovation

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30308   (Fulton County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is considered Phase 2 and would complement the previous project executed in 2014. The existing batting cages, pitching tunnel, video room, concessions and toilet areas are either inadequate in size and/or not organized in an efficient manner. Additionally, there will be an enhanced fan experience space, with a multi-purpose space and a terrace to overlook the field. The Phase 2 would create new interior batting cages, pitching lab and video room under the existing third base stands. The video room will house additional equipment and servers for the video playback & analysis, pitching and hitting analysis systems that will contain additional cameras throughout the cages and lab. These spaces will be directly accessed from the field, dugout, existing home team interior spaces via the weight room, and from upstairs through the new multi-purpose Heritage Hall. A stair and elevator will provide access up to concourse and rooftop level. Minor interior renovation upgrades will also be made to the official’s locker room to allow for dual use as an alumni locker room, these include new lockers, paint, and carpet. The Concourse level includes new concessions, restrooms, and ticketing to improve fan experience, as well as a new multi-use Heritage Hall. The multipurpose Heritage hall will function as new front door to the stadium, providing an entry off a space large enough to accommodate a full team and staff meeting. This space will also be utilized as a hospitality event space on both game days and non-game days.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents