Similar Projects
Bayer Pharmaceutical Distribution Center
New Construction - 220,000 SF
Conception
$10,000,000 CJ est. value
Saxonburg, PA

Crossroads X-2 Warehouse
New Construction - 475,000 SF
Design
$5,000,000 to $10,000,000 est. value
Lenhartsville, PA 19534

Produce Stand and Barn Development
New Construction - 3,676 SF
Design
$350,000 est. value
Peach Bottom, PA 17563

Extra Space Storage
Addition - 21,916 SF
Sub-Bidding
$275,000 est. value
Pittsburgh, PA 15208

Restaurant Depot
New Construction - 60,981 SF
Post-Bid
$6,000,000 est. value
Limerick, PA 19468

Spring Creek Warehouses
New Construction - 325,580 SF
Post-Bid
$10,000,000 CJ est. value
Breinigsville, PA 18031

New Stockpile Facility
New Construction - 13,500 SF
Results
$4,700,000 to $5,900,000 est. value
PA

New Maintenance Building for Loyalhanna Township, Bid Package A: General Construction
New Construction - 72,000 SF
Results
Loyalhanna, PA 15661

Goodman Logistics Center
New Construction - 1,846,028 SF
Construction
$1,000,000 est. value
Etters, PA 17319

UHL Storage Site
New Construction - 10,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Allison Park, PA 15101

I-81 Commerce Park - Lot 1
New Construction - 1,100,000 SF
Design
$10,000,000 CJ est. value
Shippensburg, PA 17257

Post and Frame Building
Post-Bid
Fleetwood, PA 19522

35 DEP 14X40 Shed Structure
Results
Harrisburg, PA

The Cubes f/k/a Warehouse
New Construction - 450,000 SF
Construction
$10,000,000 CJ est. value
Allentown, PA 18103

Martin Development
New Construction - 5,000 SF
Design
$700,000 est. value
East Earl, PA 17519

Last Updated 01/03/2020 07:59 AM
Project Title

Salt and Equipment Storage Building

Physical Address View project details and contacts
City, State (County) Saegertown, PA   (Crawford County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed Storage Building involves construction of a wood post-frame vinyl sided building approximately 1,440 square feet in size with doors, concrete floor and related work. Work will also include demolition and removal of the existing Salt and Equipment Storage Building.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents