Similar Projects
Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

Water Storage Tanks Cleaning
Alteration
Post-Bid
Cedar Rapids, IA 52404

Elevated Water Storage Tank
Infrastructure
Results
$726,393 est. value
Kimballton, IA 51543

Pump Station and Ground Storage Reservoir
New Construction, Infrastructure
Results
$1,300,000 est. value
Ashton, IA

Inspection, Cleaning, and Repair of Water Tower
Infrastructure
Results
Glenwood, IA

North Water Tower
Alteration
Results
Altoona, IA 50009

Winnebago Water Tower Painting and Concrete Foundation Repair
Infrastructure, Alteration
Results
Forest City, IA

Cold Storage Building Improvements
Alteration
Post-Bid
Milford, IA

Fuel Oil Storage Tank Enclosure
Infrastructure
Bidding
Pella, IA 50219

Last Updated 04/01/2022 03:17 PM
Project Title

Water Towers at Iowa Army Ammunition Plant (IAAAP)

Physical Address View project details and contacts
City, State (County) Middletown, IA 52638   (Des Moines County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents