Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Joint Airbase Concrete Ramp Repair
Infrastructure
Bidding
Des Moines, IA 50321

Water Towers at Iowa Army Ammunition Plant (IAAAP)
New Construction
Bidding
Middletown, IA 52638

Johnson County Historic Poor Farm Site Development
Infrastructure
Post-Bid
Iowa City, IA

Mount Vernon Business 30 Resurfacing and Improvements
Infrastructure
Post-Bid
Mount Vernon, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

County T Road Reconstruction
Infrastructure
Bidding
Brayton, IA

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

Walnut Street Streetscape Phase 1
Infrastructure, Alteration
Bidding
Dallas Center, IA

Reported 09/22/2021 12:00 AM
Project Title

Sheldon Water Tower

Physical Address View project details and contacts
City, State (County) Hospers, IA 51238   (Sioux County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected October 2021, Construction Completion Expected fourth quarter 2023
Bids Due View project details and contacts
Estimated Value $3,600,000 to $3,800,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A 1.0 million gallon composite water tower with a height to overflow of 145 feet, including foundation and necessary preparatory work. Ground floor of water tower will include approximately 1,100 SF process and cold storage area, including interior piping, valves, and fittings (area depends on pedestal diameter). All mechanical, electrical and control equipment necessary to provide a fully functioning facility. Site piping including 16” diameter piping, valves and fittings including corrosion protection. Site work including but not limited to fill, grading, culverts, energy dissipation structures and access road construction. Approximately 325 SF of concrete sidewalk and 3,000 SF of aggregate base course and gravel surfacing (areas depend on pedestal diameter). Temporary and permanent erosion control, fencing, reclamation and seeding.

Details

Lift and Pump Stations, 1,100 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents