Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

2022 3rd Avenue Reconstruction Project
Infrastructure
Bidding
Less than $1,545,800 est. value
Marion, IA 52302

8th Street RCB Repairs
Infrastructure
Bidding
West Des Moines, IA 50265

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

West Elm and North Vine Street Improvements
Results
$553,988 est. value
West Union, IA

Clover Lane Overlay
Results
Asbury, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Tower Terrace Road from Miller Road to I-380
Conception
$1,500,000 est. value
Cedar Rapids, IA

U.S. 6 (Hickman Road) and Berkshire Parkway/SE Waco Place Intersection Improvements
Infrastructure
Bidding
Clive, IA 50325

Mount Vernon Business 30 Resurfacing and Improvements
Infrastructure
Post-Bid
Mount Vernon, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

2021 Sanitary Sewer Spot Repair Program
Infrastructure
Bidding
Less than $61,000 est. value
Urbandale, IA 50322

Last Updated 10/11/2021 11:06 AM
Project Title

County T Road Reconstruction

Physical Address View project details and contacts
City, State (County) Brayton, IA   (Audubon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $201,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal of the existing County T Road from Highway 71 to Clinton Street, stabilization of the subgrade, new concrete pavement or granular surfacing, sidewalk repairs and the installation of ADA compliant curb ramps at the Clinton Street intersection

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents