Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

128 th St - PCC Pavement - Replace
Infrastructure
Bidding
Urbandale, IA

I-80 - PCC Patching
Infrastructure
Bidding
IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

High School Parking Lot Expansion
Infrastructure
Post-Bid
$1,028,199 est. value
Alleman, IA 50007

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

I-35 - PCC Patching
Infrastructure
Bidding
IA

Valley Junction Business District Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA 50265

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

I-235 - PCC Patching
Infrastructure
Bidding
IA

Sidewalk and Crossing Guard Snow Removal and Ice Control Services
Term Contract
Post-Bid
West Des Moines, IA

Valley View Park North Loop Road Extension
Infrastructure
Results
West Des Moines, IA

I-80 - PCC Joint and Crack Filling
Infrastructure
Bidding
IA

Truck Entrance Road Rehab and Replacement
Infrastructure
Post-Bid
Johnston, IA

Reported 04/07/2022 04:00 PM
Project Title

U.S. 6 (Hickman Road) and Berkshire Parkway/SE Waco Place Intersection Improvements

Physical Address View project details and contacts
City, State (County) Clive, IA 50325   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes all materials, equipment, transportation and labor necessary to lengthen PCC left turn lanes, reconstruct trail and sidewalk ramps, and construct a traffic signal at the intersection. Project items include subgrade preparation and treatment, PCC turn lane extension and sidewalk/trail ramp paving, pavement markings, traffic signalization and traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents