Similar Projects
Windsor Place
New Construction - 5,100 SF
Conception
West Palm Beach, FL 33417

Tuttle Apartments
New Construction
Conception
$86,000,000 est. value
Davenport, FL 33837

Selby Garden Master Plan
New Construction - 99,500 SF
Design
Sarasota, FL 34236

Dwell at Lake Mary
New Construction
Design
Lake Mary, FL 32746

Covington Park Amenity Center
Addition - 800 SF
Bidding
Apollo Beach, FL 33572

Cardinal Corner
New Construction - 2,600 SF
Sub-Bidding
$5,000,000 est. value
Arcadia, FL 34266

Bradenton 88 AKA Carr Landing
New Construction
Post-Bid
Bradenton, FL 34203

Southside Senior Center
New Construction - 6,600 SF
Post-Bid
Less than $3,396,420 est. value
Jacksonville, FL

Community Center Restroom Remodel
Results
$150,000 est. value
Vero Beach, FL 32960

Walton Community Center Renovations
Renovation
Results
$130,000 est. value
Fort Pierce, FL 34982

Grande Palms at Tradition - Phases l and ll
New Construction - 25,950 SF
Construction
$14,000,000 est. value
Port Saint Lucie, FL 34953

Jefferson Sand Lake
New Construction
Construction
Orlando, FL 32819

Avalon Apartments
New Construction
Pending Verification
Largo, FL 33778

Swan Lake Village
New Construction
Pending Verification
Lakeland, FL

The Village at Oakland Park
New Construction
Conception
Oakland Park, FL 33311

Reported 06/24/2021 03:03 PM
Project Title

CMAR for the New Senior Center

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32308   (Leon County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new Senior Center on a site (6 acres) located on Welaunee Blvd. The City is considering the services of a Construction Management Firm At Risk (CM/GC) for the Project. In addition to managing the construction, the CM/GC will provide technical review, cost evaluation and schedule evaluation assistance to the architectural/engineering team during the design phase. CM/GC will assume responsibility for project construction cost by issuing a Guaranteed Maximum Price (GMP) not later than 80% through the design phase. The GMP will be a contractual obligation. CM/GC will also develop an overall project schedule, which will be a contractual obligation. In addition, CM/GC will be responsible for methods of construction, safety, and the scheduling and coordination of the work of all construction and miscellaneous contracts required for completion of the project within its predetermined budget and schedule. The project will be designed and constructed to a level of quality and timeliness that reflects the long-term use of a City owned facility. The building will have approximately 46,000 sf of finished space and will meet all building code requirements.

Details

1 Clubhouse/Social Club, 46,000 SF New Construction, 6 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents