Similar Projects
Last Updated | 02/20/2020 08:07 AM |
Project Title | Water Plant Improvements - 2019 |
Physical Address | View project details and contacts |
City, State (County) | Richmond, TX 77406 (Fort Bend County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $103,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes, but is not limited to: touch-up coating the GST No. 1 surface water fill line coupling, manway hatch exterior, suction line, column plate, surface water line connection, and interior overflow weir box; filling the gap between the overflow line and piping support with grout on GST No. 1; blast and recoat the interior roof and rafter structure on GST No. 1 including the eight feet of top of wall; replace the insulation around the small diameter piping on the roof of GST No. 1; replace the exterior foundation sealant on GST No.2; touch-up coating on the GST No. 2 suction line, manway hatch, roof hatch, flap valve, fill line, and interior overflow box; replace insulation around overflow line valve and exterior piping on GST No. 2; replace the heat lamp bulb in the cabinet of HPT 1; touch-up coating the cabinet interior of HPT No. 1; replace the heat lamp bulb in the cabinet of HPT 2; replace the flexible conduit for the flow meter on Water Well No 1; touch-up coating the Water Well No. 1 discharge head, gate valve, check valve, base plate, piping and air release assembly; touch-up coating on the Water Well No. 2 piping; replace the insulation around the chlorine injection line on Water Well No. 2; touch-up coating on the Water Well No. 3 the discharge head, shaft guard, check valve, assembly base plate, flow meter, gate valve and discharge piping; replace pressure indicator Water Well No. 3; touch-up coating the discharge head and gate valve of Booster Pump No. 1 and the discharge head and check valve of Booster Pump No. 4; replace insulation on exterior PVC lines on Pump Room; wire brush and cold spray galvanize the exterior discharge piping on Pump Room; install interior panic hardware on the interior of the doors for LAS Room; touch-up coating the Generator enclosure and fuel tank; wire brush clean and cold spray galvanize the condulet at the generator; touch-up coating on the remote well piping; weld the cabinet bottom of HPT No. 1; touch-up coat the metering cans on the weather head rack; seeding of disturbed area from construction activities. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |