Similar Projects
Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Columbia Drive Restoration
Results
VA

Massanetta Springs Road (SR 687) Improvement Project
Results
$2,177,572 est. value
Harrisonburg, VA 22802

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Hope Drive Extension
Results
$2,772,000 est. value
Winchester, VA 22601

Smart Scale Intersection Improvements
Results
Less than $4,111,000 est. value
VA

Y--Hidden Pond Trail Resurfacing
Results
Lorton, VA 22079

Full Depth Reclamation and Asphalt Resurfacing
Results
Blacksburg, VA

Hurricane Evacuation Services Peninsula
Term Contract
Results
Hampton, Newport News, VA

Lee Avenue Gate - VA ST LEE AVE GATE
Results
$1,000,000 to $5,000,000 est. value
Fort Lee, VA

Route 28 Widening
Results
$86,748,000 est. value
VA

Asphalt Paving Term Contract
Term Contract
Results
Suffolk, VA 23434

Paving
Term Contract
Results
Front Royal, VA 22630

Prince William Parkway Interchange at Realigned Balls Ford Road
Results
$145,000,000 est. value
Prince William, VA 22192

Buena Vista Industrial Park Access Road and Utilities Phase I
Results
Buena Vista, VA 24416

Last Updated 06/22/2020 10:50 AM
Project Title

King George County Middle School Turn Lane

Physical Address View project details and contacts
City, State (County) King George, VA   (King George County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 05/12/20
Owner View project details and contacts
Architect View project details and contacts
Description

Providing all labor and materials necessary to construct approximately 900 linear feet of right and left turn lanes into the King George County Middle School. The project scope includes, but is not limited to, demolition, grading, traffic control, erosion and sediment control, paving, curb and gutter and pavement striping. The project is located on Dahlgren Road, Route 206 near Kings Highway, Route 3.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents