Similar Projects
Cubesmart and Fire Station
New Construction, Build-Out - 97,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Oakland Park, FL 33334

New City Hall Complex & Westside Fire Station No. 2
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
FL 34990

Fire Station 64 Replacement at Kiwanis Park
Renovation
Design
Coral Springs, FL 33071

Construction of Hernando Beach Fire Station No. 6
New Construction
Bidding
Hernando Beach, FL 34607

Construction of Fire Station No. 5
New Construction - 11,602 SF
Bidding
Spring Hill, FL 34608

Flagler County Sheriff’s Office District 3
New Construction
Sub-Bidding
Bunnell, FL

Kathleen Fire Rescue Station
New Construction - 11,487 SF
Post-Bid
Less than $3,600,000 est. value
Bartow, Lakeland, FL 33810

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Groveland Police and Fire Building - New Public Safety Complex
New Construction - 33,490 SF
Results
Groveland, FL 34736

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Fire Station 10
Construction
Port Charlotte, FL 33948

Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

Fire Station #2
New Construction
Design
New Port Richey, FL 34652

Last Updated 04/22/2021 09:23 AM
Project Title

Fire Rescue Station 18

Physical Address View project details and contacts
City, State (County) Stuart, FL 34994   (Martin County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new fire rescue station and associated ancillary appurtenances.

Details

1 Fire/Police Station, Approximately 12,855 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents