Similar Projects
Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Murphy Express #8596
New Construction - 2,800 SF
Conception
Arlington, TX 76011

Gateway Food Mart
New Construction - 5,840 SF
Design
$1,000,000 est. value
Benbrook, TX 76126

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Murphy Express #8939
New Construction - 2,800 SF
Post-Bid
Arlington, TX 76018

Trail Lakes Apartments
New Construction, Infrastructure - 45,000 SF
Post-Bid
$6,500,000 CJ est. value
Fort Worth, TX 76133

2019 Residential Rebuild
Results
est. value
Arlington, TX 76010

Trinity Boulevard Phase 1
Infrastructure
Results
$18,000,000 est. value
Fort Worth, TX 76107

Murphy Express #8986
Renovation - 2,800 SF
Construction
Arlington, TX 76017

Caliber Auto Care
New Construction - 11,000 SF
Construction
$1,500,000 est. value
Arlington, TX 76017

Stonemont-Harmon Road / Harmon Road Spec Warehouse
New Construction, Infrastructure - 485,680 SF
Pending Verification
$20,446,233 CJ est. value
Fort Worth, TX 76177

Kirkwood Oaks - Addition and Site
Addition, Demolition, Infrastructure - 4,300 SF
Pending Verification
$2,500,000 CJ est. value
Southlake, TX 76092

Heritage & Paddock Parks Renovations & Site Improvements
Infrastructure
Conception
$13,500,000 est. value
Fort Worth, Keller, TX 76248

Take 5 Oil Change
New Construction - 1,438 SF
Design
$500,000 est. value
Fort Worth, TX

Carvana Blue Mound
Renovation - 74,420 SF
Post-Bid
Fort Worth, TX 76131

Last Updated 11/23/2022 08:10 AM
Project Title

Main Street Gasoline Service Station

Physical Address View project details and contacts
City, State (County) Mansfield, TX 76063   (Tarrant County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,640,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 23, 2022 the project is delayed. Construction is expected to start September 2022. A general contractor has been selected. An architect has been selected.

Details

10,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents