Similar Projects
Triune Centre
New Construction - 30,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fort Worth, TX 76107

Reserve at Mayfield
New Construction - 150,000 SF
Design
$20,000,000 est. value
Arlington, TX

Cowtown Crossing
Renovation - 1,100,000 SF
Post-Bid
Fort Worth, TX 76131

Harmony School of Innovation Infrastructure
Infrastructure
Post-Bid
Fort Worth, TX 76133

Annual Requirements Contract for Drill Shafts
Term Contract
Results
Arlington, TX

Mass Grading Improvements for Shale Creek
Infrastructure
Results
Fort Worth, TX

Chisolm Trail Parkway Apartments
New Construction
Construction
Fort Worth, TX 76132

Stallion Ridge Apartments
New Construction - 271,000 SF
Construction
$19,000,000 est. value
Fort Worth, TX 76140

Stonemont-Harmon Road / Harmon Road Spec Warehouse
New Construction, Infrastructure - 485,680 SF
Pending Verification
$20,446,233 CJ est. value
Fort Worth, TX 76177

Scooters Coffee #489 / Fort Worth
New Construction, Infrastructure - 664 SF
Pending Verification
$350,000 CJ est. value
Fort Worth, TX 76135

Wright Construction Offices
New Construction - 7,918 SF
Design
$1,400,000 est. value
Grapevine, TX 76051

Eagle Mountain-Saginaw ISD Elementary #18: Remaining Trades
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Fort Worth, TX 76179

Bransford Road Shared Use Path
Infrastructure
Results
$1,099,653 CJ est. value
Colleyville, TX 76034

The Carter Development
New Construction
Construction
Grapevine, TX 76051

Merrimac Circle Apartments
New Construction - 60,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Fort Worth, TX 76107

Last Updated 10/07/2022 06:04 PM
Project Title

Trail Lakes Apartments

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76133   (Tarrant County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Office, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,500,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a three-story 56-unit apartment building. As of September 27, 2022, a general contractor has been selected and is currently accepting sub-bids. Construction is set to start October 2022.

Details

3 Stories Above Grade, 45,000 SF. New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents