Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2022 Road Resurfacing Program
Infrastructure
Post-Bid
Wayne, NJ

Improvements to Leonard Street, Onyx Terrace and Dietrich Lane
Results
North Haledon, NJ 07508

Berdan Avenue and Wayne Hills High School Driveway Intersection Improvements
Results
Wayne, NJ 07470

Concrete Restoration
Term Contract, Infrastructure
Post-Bid
Clifton, NJ

Hazel Street Improvements
Results
Clifton, NJ

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Roadway Resurfacing Milepost 83 to 122 Section 19 and 20
Results
$20,000,000 to $40,000,000 est. value

Atlantic City Expressway Heavy Highway Job Order Contract
Term Contract
Post-Bid

TOC Building Parking Lot Improvements and Paving
Results
Paterson, NJ

2022 Road Improvement Program
Infrastructure
Post-Bid
$600,000 est. value
Hawthorne, NJ

Maintenance Roadway Contract N212
Results
$10,000,001 to $20,000,000 est. value

Roadway Pavement Restoration
Infrastructure
Post-Bid
Clifton, NJ

Maintenance Resurfacing Contract No 523
Results
$5,000,001 to $10,000,000 est. value

Route 20, Paterson, Safety, Drainage and Resurfacing
Infrastructure
Post-Bid
$20,000,001 to $50,000,000 est. value
Paterson, NJ 07511

Last Updated 05/31/2022 04:12 AM
Project Title

Red Twig Trail Road Improvements

Physical Address View project details and contacts
City, State (County) Bloomingdale, NJ 07403   (Passaic County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000 to $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project location is the entire length of Red Twig Trail in the Borough of Bloomingdale, County of Passaic, State of New Jersey. The project limits begin at Star Lake Road and end at the cul-de-sac. The project length is approximately 2,735 linear feet (0.518 miles). Reconstruction of existing storm inlets; installation of storm drain pipe and storm inlets; removal and replacement of concrete curbs; removal and replacement of concrete sidewalks and driveway aprons; construction of new sidewalk ramps for disable persons; asphalt road resurfacing; and, guide rail. The main items of construction and approximate quantities include, but are not necessarily limited to: reconstruction of twelve (12) storm inlets and replacement of castings; installation of twelve (12) new precast concrete storm inlets including castings; installation of 1,300 linear feet of combination storm and underdrains using 15" diameter perforated HDPE; 6,200 linear feet of Portland cement concrete curb; 1,800 square yards of Portland cement concrete sidewalks, four (4") inch thick; 800 square yards of Portland cement concrete reinforced driveway aprons, six (6") inch thick; 11,500 square yards of asphalt milling; 1,500 tons of hot mixed asphalt surface course, two (2") inches thick, mix 9.5 M64; four (4) sidewalk ramps for disabled persons; removal and replacement of 275 linear feet of guide rail, including two (2) end treatments.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Paving Specialties, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents