Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Salt Lake (Entry Improvements)
Post-Bid
Less than $75,000 est. value
Mims, FL 32754

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Last Updated 01/23/2020 01:26 AM
Project Title

43rd Avenue Sidewalk from Airport Drive West to 41st Street (IRC-1503)

Physical Address View project details and contacts
City, State (County) Vero Beach, FL 32960    (Indian River County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $509,706
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of the construction of an 8-foot-wide concrete sidewalk along the east side of 43rd Avenue from Airport Drive West to 41st Street. The sidewalk improvements will be approximately 0.87 miles in length. The work will also include erosion control, maintenance of traffic, ditch grading, minor drainage piping with drainage structures, signing and pavement markings. This is an F.D.O.T. Local Agency Program (LAP) funded project FM No. 440019-1-58-01.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents