Similar Projects
Douglas Avenue Crosswalk
Bidding
Dunedin, FL 34698

Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

District Seven FCO Structures and Sidewalk Project
Post-Bid
Less than $261,000 est. value
Clearwater, FL 33760

Concrete, Brick and Mortar Repair and Replacement
Term Contract
Post-Bid
Saint Pete Beach, FL 33706

Sidewalk Hercules Avenue Phase II From Sherwood Street to Sunset Point Road
Results
Clearwater, FL 33756

62nd Avenue Sidewalk and Intersection Improvement Project
Results
Less than $1,753,002 est. value
Clearwater, FL 33755

46th Avenue Recreational Trail
Post-Bid
$561,393 to $562,923 est. value
Kenneth City, FL

FY 2020 – FY 2022 Countywide ADA, Sidewalk, Drainage, Roadway Improvements (Pid # 004184A)
Results
$14,254,223 est. value
Clearwater, FL 33755

Saratoga Apartments Outer Parking Lots Renovations
Post-Bid
Saint Petersburg, FL 33713

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

St. Petersburg College Board of Trustees Clearwater Campus Parking Lot Repairs
Post-Bid
Clearwater, FL 33755

Sunset Point Sidewalk - Alternate 19 to Pinellas Trail PID 002926A
Results
Less than $581,812 est. value
Clearwater, FL 33755

FY21-23 Sidewalk and Underdrain Replacement
Post-Bid
Less than $4,300,000 est. value
Pinellas Park, Saint Petersburg, Seminole, FL 33702

Alt US 19 / SR 595 at Wilson Street Pedestrian Crosswalk
Results
Less than $80,000 est. value
Dunedin, FL 34698

Parking Lot and Site Lighting Renovations
Post-Bid
Largo, FL 33773

Last Updated 07/16/2020 01:52 PM
Project Title

West Bay Drive/Pinellas Trail Gateway

Physical Address View project details and contacts
City, State (County) Largo, FL   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,802,333
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct pedestrian and bicycle access and trail head improvements along the Pinellas Trail West Bay Drive Community Redevelopment District (WBD-CRD) at West Bay Drive, Largo The project limits include areas adjacent to the trail from Pine Visfa Drive to Washington Avenue SW The main objectives of the trail improvements are to: Enhance the overall aesthetics of the Trail and surrounding amenities. Enhance mobility, access and connectivity. Leverage the proximity of Downtown Largo with the Pinellas Trail overpass. Promote area-wide connectivity and economic development. Correct current deficiencies in multi-modal connections. Provide opportunities for education and information. The following is a list of the new trail connections: Washington Avenue East Connection. 2nd Avenue SW West Connection. 1st Avenue NW East Connection. Pine Vista Drive West Connection. 2nd Avenue NW East Connection.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents