Similar Projects
Douglas Avenue Crosswalk
Bidding
Dunedin, FL 34698

Bypass Drive Improvements
Bidding
$1,500,000 est. value
Clearwater, FL 33764

District Seven FCO Structures and Sidewalk Project
Post-Bid
Less than $261,000 est. value
Clearwater, FL 33760

Concrete, Brick and Mortar Repair and Replacement
Term Contract
Post-Bid
Saint Pete Beach, FL 33706

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Sidewalk Hercules Avenue Phase II From Sherwood Street to Sunset Point Road
Results
Clearwater, FL 33756

46th Avenue Recreational Trail
Post-Bid
$561,393 to $562,923 est. value
Kenneth City, FL

62nd Avenue Sidewalk and Intersection Improvement Project
Results
Less than $1,753,002 est. value
Clearwater, FL 33755

Saratoga Apartments Outer Parking Lots Renovations
Post-Bid
Saint Petersburg, FL 33713

FY 2020 – FY 2022 Countywide ADA, Sidewalk, Drainage, Roadway Improvements (Pid # 004184A)
Results
$14,254,223 est. value
Clearwater, FL 33755

FY21-23 Sidewalk and Underdrain Replacement
Post-Bid
Less than $4,300,000 est. value
Pinellas Park, Saint Petersburg, Seminole, FL 33702

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

Parking Lot and Site Lighting Renovations
Post-Bid
Largo, FL 33773

Sunset Point Sidewalk - Alternate 19 to Pinellas Trail PID 002926A
Results
Less than $581,812 est. value
Clearwater, FL 33755

Alt US 19 / SR 595 at Wilson Street Pedestrian Crosswalk
Results
Less than $80,000 est. value
Dunedin, FL 34698

Reported 01/08/2021 12:00 AM
Project Title

St. Petersburg College Board of Trustees Clearwater Campus Parking Lot Repairs

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33755   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of removing existing asphalt, install new storm drainage, replacing the asphalt, concrete curb and sidewalks, parking striping, and site lighting.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents