Similar Projects
Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Tomyn Ocoee Self-Storage
New Construction - 34,969 SF
Conception
Ocoee, FL

Airport Commerce Center
New Construction - 656,000 SF
Design
$10,000,000 CJ est. value
Orlando, FL 32824

LBA Realty Office/Warehouse 300 & 400
New Construction, Demolition - 576,000 SF
Design
Winter Park, FL 32792

Publix 1158 - Winter Garden
Renovation
Bidding
Winter Garden, FL 34787

OUC St Cloud Operations and Maintenance Facility
New Construction - 300,000 SF
Post-Bid
Orlando, FL 32800

Judge Business Center
New Construction - 79,400 SF
Post-Bid
Orlando, FL

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Building
New Construction
Results
$2,111,384 est. value
Orlando, FL 32819

Orange County Fire Station - 54 Metal Storage Building Replacement
Renovation
Results
$192,000 est. value
Orlando, FL 32821

Disney Distribution Warehouse DC 21
New Construction - 45,165 SF
Construction
$13,600,000 est. value
Lake Buena Vista, FL 32830

Narcoossee Logistics Center West - Warehouse Shell Building 1 & 2
New Construction - 279,845 SF
Construction
$12,553,490 est. value
Orlando, FL 32827

Industrial Warehouse Development
New Construction - 61,562 SF
Conception
Ocoee, FL 34761

Collegiate Village - Phase I - Retail Buildings 1, 1A, 2
New Construction - 19,605 SF
Design
$5,000,000 est. value
Orlando, FL 32826

HCC Storage Build-Out Project
Renovation
Post-Bid
Apopka, FL 32703

Minor Toll Facility Construction - North, Northwest, Central and West Florida
Renovation
Results

Last Updated 05/23/2022 03:49 PM
Project Title

All Aboard Storage

Physical Address View project details and contacts
City, State (County) Orlando, FL 32835   (Orange County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced May 2021, Construction Completion Expected June 2022
Bids Due View project details and contacts
Estimated Value $6,972,280
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

116,991 SF - 1 Warehouse/Storage, 3 Stories Above Grade, 99,246 SF New Construction, 1 Warehouse/Storage, 1 Story Above Grade, 9,750 SF New Construction, 1 Warehouse/Storage, 1 Story Above Grade, 7,995 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Overhead Rapid Coiling Doors, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents