Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Google Middlefield Park Master Plan
New Construction - 3,455,000 SF
Conception
$10,000,000 CJ est. value
Mountain View, CA

Berkeley Commons Offices and Laboratories
New Construction - 728,088 SF
Design
$10,000,000 CJ est. value
Berkeley, CA 94710

Telegraph Tower
New Construction - 905,000 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94612

MP-307R Bushard Diversion Structure Repair
Renovation
Bidding
$1,200,000 est. value
Fountain Valley, CA

Construction Management Services
New Construction
Bidding
$75,000,000 est. value
Martinez, CA 94553

FEMA Region 9 11th Floor Breakroom Remodel
Renovation
Post-Bid
Oakland, CA 94607

Office TI
Build-Out
Post-Bid
San Jose, CA 95131

Design-Build Project-Tech Park Phase 2
New Construction
Results
$6,750,000 est. value
San Luis Obispo, CA 93405

Job Order Contracting a License
Renovation
Results
Merced, CA

Mission Rock - Block G - 1st Building
New Construction
Construction
San Francisco, CA 94158

Extra Space Storage
New Construction - 26,721 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
La Quinta, CA 92253

Harrison Gardens Mixed Use Development
New Construction - 876,940 SF
Pending Verification
$518,000,000 est. value
San Francisco, CA

Almaden Boulevard Tower
New Construction - 781,000 SF
Pending Verification
$10,000,000 CJ est. value
San Jose, CA 95113

Hollywood Center Mixed Use Development
New Construction
Conception
Los Angeles, CA 90028

Last Updated 02/15/2022 04:02 PM
Project Title

Storage Star Self Storage

Physical Address View project details and contacts
City, State (County) Rio Vista, CA 94571   (Solano County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method General Contractor to Subcontract.
Project Status All Sub-Bids Received
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Development of a 3.65AC (158,910SF) self storage facility which includes the following: Self-storage component - 73425SF, Office component - 1315SF

Details

158,910 SF - Office, 1,315 SF New Construction, Warehouse/Storage, 73,425 SF New Construction, 158,910 SF New Construction, 3.65 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents