Similar Projects
John J. Carroll Water Treatment Plant Scada System Improvements - Filed Sub Bids
Bidding
Less than $13,800,000 est. value
Marlborough, MA 01752

Modifications to Back Up Generator Control System - Walter J. Sullivan Water Treatment Plant
Bidding
Less than $65,000 est. value
Cambridge, MA 02138

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Framingham High School HVAC Upgrades - Filed Sub-Bids
Post-Bid
Framingham, MA 01702

Crocker Hall Interior Renovations Phase 1 - Filed Sub-Bids
Results
Less than $660,000 est. value
Framingham, MA

Uninterrupted Power Supply (UPS) with associated Minimum Essential Characteristics
Results
Natick, MA 01760

Energy Efficient LED Lighting Upgrades at the John J. Carroll Water Treatment Plant and the Clinton Wastewater Treatment Plant
Bidding
Marlborough, MA

Construction and Installation of New Stand-By Generator with ATS
Post-Bid
Less than $100,000 est. value
Reading, MA

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Electrical Work
Bidding
Chelmsford, MA

Water Treatment Plant Ozone and Plant Upgrades - Sub-Bids
Post-Bid
Billerica, MA

Bathroom Upgrades, Cedar Gardens 667-1 and 667-2 - Filed Sub Bids
Results
$498,000 est. value
Natick, MA 01760

Multi-Year Service Contract for Emergency and Routine Electrical Services
Term Contract
Bidding
Less than $45,000 est. value
Medford, MA

Automated Metering Infrastructure System
Post-Bid
Groton, MA

CWTP Ancillary Mods - Sodium Hypochlorite System Modifications - Filed Sub Bid
Results
Less than $1,860,000 est. value
Marlborough, MA 01752

Reported 11/09/2019 12:00 AM
Project Title

Trade Contractor Prequalification New Fuller Middle School

Physical Address View project details and contacts
City, State (County) Framingham, MA 01702   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $77,935,429
Plans Available from Architect/Engineer - 10/18/19
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Electrical work to support the Early Site Package for the construction of the new 136,790 square foot Fuller Middle School located in Framingham, Massachusetts

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents