Similar Projects
MCC Carole Cowan Penthouse Roof Replacement
Bidding
$181,236 est. value
Lowell, MA 01852

Capen Court Air-Cooled Chiller Compressor Replacement
Bidding
$16,500 est. value
Somerville, MA 02144

Trade Contractor Prequalification New Fuller Middle School
Post-Bid
Less than $77,935,429 est. value
Framingham, MA 01702

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Install Automatic Access Doors, Bldg. 1993
Results
Less than $25,000 est. value
Bedford, MA 01731

Replace Two Sets of Double Entrance Doors, Bldg 1530
Results
Less than $25,000 est. value
Bedford, MA 01731

Plumbing
Bidding
Chelmsford, MA

Framingham City Hall Skylight Repair
Post-Bid
$70,000 est. value
Framingham, MA 01702

Install Handicap Push Pads
Results
$25,000 to $100,000 est. value
Bedford, MA 01731

Roof Repair and Maintenance Services Contract
Term Contract
Bidding
Reading, MA

Framingham High School HVAC Upgrades - General Bids
Post-Bid
Framingham, MA 01702

Crocker Hall Interior Renovations Phase 1 - Filed Sub-Bids
Results
Less than $660,000 est. value
Framingham, MA

Annual Window System Repair and Replacement Services
Term Contract
Bidding
$50,000 est. value
Newton, MA

Framingham High School HVAC Upgrades - Filed Sub-Bids
Post-Bid
Framingham, MA 01702

UMass Amherst Mount Ida Campus Building 770 Room 118 HVAC
Results
$240,000 est. value
Newton, MA 02459

Reported 11/21/2019 12:00 AM
Project Title

Water Treatment Plant Ozone and Plant Upgrades - Sub-Bids

Physical Address View project details and contacts
City, State (County) Billerica, MA   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Painting, Plumbing, Roofing, Windows/Doors
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work including replacement of the existing ozone system with a pre-selected ozone system, construction of a new ozone process building and associated Site work, demolition of the existing ozone system, concrete repair to the existing pretreatment tanks, replacement of chemical feed tanks and equipment; and all materials and equipment, services and construction inherent to the Work.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents