Similar Projects
Green Meadows Apartments Mixed-use Development
New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Bessemer, AL 35022

Jessie's Place Renovation
Renovation
Conception
$5,000,000 CJ est. value
Birmingham, AL 35203

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Godbold Building
New Construction - 54,400 SF
Design
Auburn, AL 36830

RFP - Project Management Professional Services
Term Contract
Bidding
Prichard, AL 36610

Renovation of L.R. Patton Apartments
Renovation
Post-Bid
Huntsville, AL 35805

North Dean Road Apartments
New Construction, Infrastructure
Post-Bid
$30,000,000 CJ est. value
Auburn, AL 36830

Capstone Village Miscellaneous Apartment Renovations
Renovation
Results
$200,000 est. value
Tuscaloosa, AL

Unit Rehabilitation (Riverview Apartment 403-B)
Renovation
Results
$22,762 CJ est. value
Phenix City, AL 36867

Stoneridge Villas - Phase 2
New Construction
Construction
$9,500,000 est. value
Madison, AL 35757

The Gabriel
New Construction - 110,023 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Madison, AL 35757

701-711 S Brundidge Street Residential
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Troy, AL 36081

Caribe Beach
New Construction
Pending Verification
Orange Beach, AL 36561

412 Fairhope Avenue Building
Renovation, Addition - 7,050 SF
Design
Fairhope, AL 36532

City Center - Phase III
New Construction
Post-Bid
Huntsville, AL 35801

Last Updated 10/09/2023 08:36 AM
Project Title

Westgate Gardens Apartment Renovations

Physical Address View project details and contacts
City, State (County) Decatur, AL 35601   (Morgan County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will be responsible for providing all labor, tools, equipment, security, services, water, light, heat, power, transportation, and supervision necessary for the satisfactory performance of the work subject to this IFB. 2.1 The attached scope of work located in the project manual gives a description and technical specifications for the Westgate Garden Apartment Renovations. Although DHA has attempted to identify all of the needs. the scope or work may or may not be all-inclusive. The bid bond or guarantee equivalate to 5% of the bid price shall be included in the bid package submitted by each bidder for any proposed fee that is greater than $50,000 The bidder agrees to provide DHA with a satisfactory and will be submitted by the successful bidder prior to execution of payment and performance bond executed by the bidder and a corporate surety qualified to do business in Alabama, in an amount equal to, but not less than one hundred percent (100%) of the bid amount QUESTION SUBMITTAL DEADLINE no later than seven (7) business days before bidding due date. Via internet system or email to mark.blazer@edtinc.net 23E-02-22500 QUESTION SUBMITTAL DEADLINE no later than seven (7) business days before bidding due date. Via internet system or email to mark.blazer@edtinc.net All questions pertaining to this IFB must be submitted in writing. Oral communications are discouraged and neither DHA nor the Architect will not be bound by any oral answers or interpretations of the IFB. Written question may be submitted via the internet system or via email.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents