Similar Projects
The 600 f/k/a City Center
Renovation - 617,453 SF
Conception
Birmingham, AL 35215

The 600 f/k/a City Center
Renovation - 617,453 SF
Conception
Birmingham, AL 35215

Parkside District - Master Plan
Renovation
Design
Birmingham, AL 35216

Walmart Supercenter #4187-230 - Smart Bundle
Renovation - 165,312 SF
Design

Security and Services Training Facility
Demolition, LEED Certification, New Construction, Infrastructure - 22,500 SF
Bidding
$10,000,000 CJ est. value
Birmingham, AL 35212

Security and Services Training Facility
Demolition, LEED Certification, New Construction, Infrastructure - 22,500 SF
Bidding
$10,000,000 CJ est. value
Birmingham, AL 35212

BX Birmingham Xpress, Bus Rapid Transt (BRT) - Transit Stations
New Construction
Post-Bid
Birmingham, AL 35208

UAB Highlands Hospital - Fourth Floor Inpatient Dialysis
Renovation
Post-Bid
Birmingham, AL 35205

Ruffner Park Revitalization Phase I
Infrastructure
Results
Irondale, AL 35210

CRGP Housing Rehabilitation
Renovation
Results
Birmingham, AL

The Village at Meadowbrook f/k/a Mitchell Center
New Construction - 15,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Hoover, AL

Mercantile on Morris a/k/a Founders Station-Phase II
Renovation - 14,000 SF
Construction
Birmingham, AL 35203

Homewood Suites and Hilton Garden Inn
New Construction
Pending Verification
Hoover, AL 35244

The Bray
New Construction
Pending Verification
Vestavia Hills, AL 35242

Wildwood Shopping Center
New Construction
Conception
Homewood, AL 35209

Last Updated 01/09/2023 12:03 PM
Project Title

The Star Uptown / Carraway Hospital Redevelopment

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35234   (Jefferson County)
Category(s) Commercial, Heavy and Highway, Medical, Residential
Sub-Category(s) Apartments/Condominiums, Hospital, Hotel/Motel, Office, Paving/Reconstruction, Retail, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $300,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the demolition of an existing structure and new construction of a new mixed-use development to include housing, retail, entertainment, medical and possibly a hotel. The full scope of work has not yet been finalized and is subject to change; however, the existing hospital building will be retained and converted into housing. An architect has been selected. As of December 6, 2022, demolition and abatement work began onsite June 13, 2022 and the demolition contractor has been identified. A general contractor has not been selected. Vertical construction work is expected to begin first quarter 2023 with a first phase of work and will have subsequent phases starting early 2024 and early 2025.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Metal Joists, Steel Joist Framing, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Mercantile and Service Equipment, Vending Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Furniture, Office Furniture, Seating, Hospitality Furniture, Institutional Furniture, Healthcare Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Substations, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents