Similar Projects
Ham Brown Reserve Master Plan
New Construction
Conception
Poinciana, FL

Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

Nolte Road Commercial Park Master Plan
New Construction
Design
Saint Cloud, FL 34772

Kindred - Phase 3
New Construction
Design
Kissimmee, FL 34744

Illinois Avenue Pipe Lining Project - Rebid
Infrastructure
Bidding
$1,160,158 CJ est. value
Saint Cloud, FL 34769

Industrial Lane Distribution Center Building 100 and 200
New Construction, Infrastructure - 281,218 SF
Bidding
Poinciana, FL 34758

LDS St Cloud Meetinghouse - Parking Lot Expansion
Infrastructure - 50,450 SF
Sub-Bidding
$100,000 CJ est. value
Saint Cloud, FL 34772

LDS St Cloud Meetinghouse - Parking Lot Expansion
Infrastructure - 50,450 SF
Sub-Bidding
$100,000 CJ est. value
Saint Cloud, FL 34772

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Add Left Turn Lane(s)
Results
Less than $2,004,920 est. value
FL

Hudson Street Improvements
Results
$321,010 est. value
Kissimmee, FL 34741

Kindred - Phase 2
New Construction - 1,906,608 SF
Construction
Kissimmee, FL 34744

Reunion West - Phase 4
New Construction
Construction
Kissimmee, FL 34741

Osceloa County Frito-Lay Fulfillment Center
New Construction, Infrastructure - 355,000 SF
Pending Verification
$180,000,000 CJ est. value
Kissimmee, FL 34758

Last Updated 08/30/2022 03:33 PM
Project Title

Southern Pines Phase 5

Physical Address View project details and contacts
City, State (County) Saint Cloud, FL 34769   (Osceola County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $37,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on the southwest corner of the intersection and east of Michigan Avenue. Scope details have not been released. As of August 30, 2022, a building permit has been issued and construction is underway.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents