Similar Projects
Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

Hickory Village at Lake Gentry
New Construction, Infrastructure
Conception
$212,400,000 CJ est. value
Saint Cloud, FL 34772

Nolte Road Commercial Park Master Plan
New Construction
Design
Saint Cloud, FL 34772

SkydiveXperience
New Construction, Infrastructure - 30,000 SF
Design
$45,000,000 CJ est. value
Kissimmee, FL 34747

O'Reilly Auto Parts / Kissimmee
New Construction, Infrastructure - 7,500 SF
Post-Bid
$300,000 CJ est. value
Kissimmee, FL 34746

Storcon Self-Storage Facility
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Buena Ventura Lakes, FL 34743

Asphalt Resurfacing
Infrastructure
Results
FL

Milling and Resurfacing Guardrail
Infrastructure
Results
$17,928,893 est. value

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Encompass Health Rehabilitation Hospital of Kissimmee Phase 1
New Construction, Infrastructure - 52,470 SF
Construction
$35,000,000 CJ est. value
Kissimmee, FL 34746

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Canoe Creek Road Widening Project - Osceola County
Infrastructure
Pending Verification
$700,000 CJ est. value
Saint Cloud, FL 34773

Cyrils Drive Widening from Narcoossee to Absher - County Of Osceola -
Infrastructure
Conception
$5,000,000 est. value
Saint Cloud, FL 34771

Osceola Village Center Daybreak Market
New Construction, Infrastructure - 4,800 SF
Design
Kissimmee, FL 34741

Imprint Senior Living Community / Saint Cloud
New Construction, Infrastructure - 58,214 SF
Post-Bid
$30,000,000 CJ est. value
Saint Cloud, FL 34772

Last Updated 02/08/2023 05:08 PM
Project Title

Osceloa County Frito-Lay Fulfillment Center

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34746   (Osceola County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $180,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of project is new construction of warehouse/distribution facility. As of February 8, 2023, the project is in design. There has not been a building permit submitted to Osceola County as of yet. Information regarding the general contractor and method of selection has not been disclosed. The construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 355,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents