Similar Projects
Road Widening and Reconstruction Poinciana Boulevard
Infrastructure
Design
FL

West Oak Street Intersection Improvements at John Young Parkway
Infrastructure
Bidding
$300,000 est. value
Kissimmee, FL 34741

Pavement, Sidewalk, Curb and Gutter Repair Services
Post-Bid
Kissimmee, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Add Left Turn Lane(s)
Results
Less than $2,004,920 est. value
FL

Hudson Street Improvements
Results
$321,010 est. value
Kissimmee, FL 34741

Neptune Elementary Parent Loop Project
Infrastructure
Post-Bid
Saint Cloud, FL 34769

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Harmony Neighborhoods C-1 and C-2 Roadway Rehabilitation
Infrastructure
Post-Bid
$2,000,000 est. value
Saint Cloud, FL

Resurfacing - Drainage Improvements - Base Work - SR 400 (I-4)
Infrastructure
Results
$31,995,105 est. value
FL

Fortune Road and Simpson Road Intersection Improvement Project
Infrastructure
Post-Bid
$2,000,000 est. value
Kissimmee, FL 34746

Asphalt Resurfacing
Infrastructure
Results
FL

Milling and Resurfacing Guardrail
Infrastructure
Results
$17,928,893 est. value

Construction Services for the Bill Beck Boulevard Extension Project
Infrastructure
Results
$7,939,380 est. value
Kissimmee, FL 34744

Downtown Revitalization Project Phase II
Infrastructure
Results
$6,000,000 est. value
Saint Cloud, FL

Reported 07/13/2022 09:47 AM
Project Title

Cyrils Drive Widening from Narcoossee to Absher - County Of Osceola -

Physical Address View project details and contacts
City, State (County) Saint Cloud, FL 34771   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Saint Cloud, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Phase three of the Cyrils Drive Widening from Narcoossee to Absher. As of July 12, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents