Similar Projects
Last Updated | 03/15/2023 01:08 PM |
Project Title | Chandler Park Academy (CPA) Middle School Cafeteria HVAC-A/C Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Harper Woods, MI 48225 (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. Provide all items, articles, materials, operations or methods listed, mentioned or scheduled on Drawings and/or herein, including all labor, materials, equipment and incidentals necessary and required for the completion of electrical systems. B. These Specifications and the accompanying Drawings contemplate the furnishing and installation of all materials, equipment, supplies, labor and supervision required for the complete performance of all operations relating to the Electrical Trades work. C. The work shall be done in accordance with best practice so as to contribute to efficiency of operation and minimum maintenance and shall be installed with proper accessibility. The materials and equipment, including all necessary accessories, shall be put into proper adjustment so that the component parts function together as a workable system. The Electrical Contractor shall provide all equipment, materials and operations as indicated either on the Drawings or contained herein or as may be reasonably implied by either to accomplish a complete electrical system. D. All work shall be performed in a first class and workmanlike manner, in accordance with the latest accepted standards and practices for the Trades involved. None but experienced persons in the work to be performed shall be allowed to do the work. This applies particularly to items such as cable splicing, control work, systems connections, etc. Four(4) new Vertical Unit Ventilators (VUV's) will be installed to provide heating and cooling for the cafeteria. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |