Similar Projects
Sherrills Ford Pump Station Upgrade (3rd Pump) - Catawba County
Renovation
Conception
$265,000 est. value
Sherrills Ford, NC 28673

WasteWater Treament Plant Digester - Town of Morehead City
Renovation
Conception
$500,000 est. value
Morehead City, NC 28557

Neuse River Resource Recovery Facility Bioenergy Recovery
New Construction
Bidding
$7,000,000 est. value
Raleigh, NC 27610

Wastewater Treatment Plant 2 Improvements
Renovation
Bidding
$5,500,000 est. value
Sylva, NC 28779

EMJ WTP Flocculation and Sedimentation Basins 1-4 Modifications
Post-Bid
Raleigh, NC 27614

Wastewater Treatment Plant Septage Offload Station
Infrastructure
Post-Bid
Dunn, NC

Wastewater Treatment Facility Upgrades
Results
Surf City, NC 28455

Water Treatment Plant Improvements
Results
Less than $13,000,000 est. value
Smithfield, NC 27577

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

Neilson Water Treatment Plant Modernization Project
Renovation
Construction
Clemmons, NC 27012

Franklin Water Treatment Plant Reliability Improvement Project - City Of Charlotte
Renovation
Conception
Charlotte, NC 28216

Falls Lake Raw Water Intake Structure Rehabilitation
Renovation
Bidding
$500,000 est. value
Raleigh, NC

Water Treatment Plant Improvements and Distribution System Repairs
Infrastructure
Post-Bid
Maysville, NC

Water Plant Rehabilitation
Results
Less than $467,921 est. value
Havelock, NC 28532

Dukes Water Treatment Plant Reliability Improvements Project - City of Charlotte
Renovation
Conception
$10,000,000 est. value
Huntersville, NC 28078

Last Updated 07/13/2022 08:35 AM
Project Title

P1043 Water Treatment Plant Replacement, MCB, Camp Lejeune, NC

Physical Address View project details and contacts
City, State (County) State-Wide: NC
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project constructs an 8 million gallons per day (MGD) water treatment facility that utilizes membrane filtration technology. The membrane filtration technology w ill better enable compliance with current and future regulatory requirements in addition to addressing possible salt water intrusion into the w ater supply aquifers. Provide adequate and environmentally compliant supply of potable water to meet the domestic, industrial, and fire protection requirements of Marine Corps Base, Camp Lejeune.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents