Similar Projects
Overhead Storage Tank Painting for Arlington-LNG
Infrastructure
Bidding
$50,000 est. value
Arlington, TN 38002

Rock Springs Road Elevated Water Storage Tank Recoating
Infrastructure
Bidding
$600,000 est. value
Smyrna, TN 37167

Contact Time Basin
Post-Bid
Luttrell, TN 37779

Water Storage Tank Rehabilitation
Post-Bid
Clarksville, TN

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Potable Water Storage Tank Inspection Services
Infrastructure
Bidding
Murfreesboro, TN

Interior Maintenance Water Mixing System
Post-Bid
Rogersville, TN

Bristol WTP Washwater Tank Painting & Improvements
Results
Bristol, TN

750,000 Gallon South Elevated Water Storage Tank
Infrastructure
Bidding
Millington, TN 38053

Maintenance of Regulated Underground Storage Tanks (Fuel) University of Tennessee Health Science Center (Memphis Campus) Facilities Administration Physical Plant
Term Contract, Infrastructure
Post-Bid
Memphis, TN 38103

Overhead Storage Tank Painting
Renovation
Results
Memphis, TN 38103

Bratcher Street Tank Rehabilitation
Infrastructure
Post-Bid
McEwen, TN 37101

Industrial Park Water Storage Tank Rehabilitation
Results
$86,000 est. value
Woodbury, TN 37190

Reservoir Rehabilitation for Bordeaux 1 and Bordeaux 2
Alteration
Post-Bid
Nashville, TN 37218

Reported 02/17/2022 04:56 PM
Project Title

Construction of the Dry Valley Storage Tank

Physical Address View project details and contacts
City, State (County) Townsend, TN 37882   (Blount County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing a new 70,000-gallon water storage tank on a property along Shuler Road, near Townsend, Tennessee in Blount County. Included in the project scope is all related site work including, but not limited to: grading and drainage, erosion and sedimentation control, tree and stump removal and clearing, log transport, gravel access drive placement, new security fence and gate, waterline extension and tie-in, and all electrical and communication line installation necessary to commission the tank into service. Modifications to the Dry Valley Booster Pump Station SCADA system, as described in Division 17 specifications, is also part of this contract. Project site is on the east side of Shuler Road, near Townsend in Blount County. Site is approximately 2,000 feet south from the intersection with School House Gap Road.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents