Similar Projects
Install Sewage Lines on West Prien Lake Road - City of Lake Charles
Infrastructure
Conception
$900,000 CJ est. value
Lake Charles, LA 70605

Install Lift Station System Near Prien Lake and Heard Roads - City of Lake Charles
Infrastructure
Conception
$700,000 CJ est. value
Lake Charles, LA 70601

Westwood Elementary Gymnasium
New Construction, Infrastructure
Design
$2,700,000 CJ est. value
Westlake, LA 70669

Intracoastal Park Hurricane Repair Project
Infrastructure
Design
$600,000 CJ est. value
Sulphur, LA 70665

Beauregard Parish Library Wye Branch
New Construction, Infrastructure
Bidding
$330,000 CJ est. value
Deridder, LA 70634

LA 70: LA 1 - LA 1015-1
Infrastructure
Bidding
$15,000,000 CJ est. value
Paincourtville, LA 70391

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

Mchugh Road Improvements
Infrastructure
Results
$444,761 est. value
Baton Rouge, LA

Various Fields in Iberia and Vermilion Parishes
Infrastructure
Results
Baton Rouge, LA

Z1DA--Project 667-15-104 Renovate and Expand CATH Lab Services
Renovation, Addition
Construction
$2,000,000 to $5,000,000 est. value
Shreveport, LA 71101

Preston Crownover Artificial Turf Field
Infrastructure
Construction
$1,168,700 CJ est. value
Bossier City, LA 71112

Shell Chemical Geismar Plant Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,200,000,000 CJ est. value
Geismar, LA 70734

CF Industries Ammonia Facility
New Construction, Infrastructure
Pending Verification
$2,000,000,000,0 CJ est. value
Donaldsonville, LA 70346

Chennault Sewage - Phase 1 - City of Lake Charles
Infrastructure
Conception
$5,000,000 CJ est. value
Lake Charles, LA 70615

Last Updated 08/22/2022 10:33 AM
Project Title

Industrial Electrical Technology Program Expansion

Physical Address View project details and contacts
City, State (County) Oakdale, LA 71463   (Allen County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $581,400 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Any person requiring special accommodations shall notify facility planning and control of the type(s) of accommodation required not less than seven (7) days before the bid opening. Plan holders are responsible for their own reproduction costs. Questions about this procedure shall be directed to the Designer at: PHONE (337) 439-8871 Stephen Hotard, Architect All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of General Building Construction. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity. The Owner shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed Scope Of Work: Furnish all labor and material necessary to provide and install the complete plumbing portion ofthis Contract as called for herein and on accompanying drawings. Parts of the plumbing division may be bid separately or in combination, at the Contractor's option; however, it shall be the responsibility of the General Contractor to assure himself that all items covered in the Plumbing Division have been included if he chooses to accept separate bids.Itis the intent ofthis specification that all materials with temperatures below ambient conditions or conveying any fluid/gas attemperatures below 70 deg. F be insulated to completely eliminate the potential for condensation. Unless specified elsewhere in these specifications, for materials that do not require access, insulate with 2" thick 3/4# density fiberglass ductwrap insulation with foil face (seal all joints air and water tight]. For materials requiring occasional access, use 2" thick closed cell rubberized insulation with re-sealable fabric joints (hook and loop type]. Contractor shall refer to the Architectural and Structural drawings and install equipment, piping, etc. to meet building and space requirements. No equipmentshall be bid on or submitted for approval ifit will not fit in the space provided. It is the intention ofthese specifications that all plumbing systems shall be furnished complete with all necessaryvalves, controls, insulation, piping devices, equipment, etc. necessary to provide a satisfactory installation that is complete and in good working order. Contractorshallvisitthe site and acquainthimselfthoroughlywith all existing facilities and conditions which would affect his portion ofthe work. Failure to do so shall not relieve the Contractor from the responsibility of installing his work to meet the conditions.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents