Similar Projects
Heritage Garage Office Remodel
Renovation
Conception
$150,000 est. value
Phoenix, AZ

Facilities and Services Complex Modification
New Construction, Renovation
Conception
$24,479,000 est. value
Phoenix, AZ 85034

QuikTrip #1437
New Construction - 5,744 SF
Design
Mesa, AZ 85212

Fleet Shop Replacement
New Construction - 45,000 SF
Design
$2,294,770 est. value
Peoria, AZ 85383

RFQ D/B - F-35A Squadron Operations Facility #6
Demolition, New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Glendale, AZ 85309

RFQ D/B - F-35A Squadron Operations Facility #6
Demolition, New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Glendale, AZ 85309

Estrella Commons
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Goodyear, AZ 85338

Maintenance, Repair and Operations Trade Services
Post-Bid
Surprise, AZ

Design-Build Manager for Water Campus Administration Building Expansion and New Lab
Renovation
Post-Bid
$13,000,000 est. value
Scottsdale, AZ

Access Control Point Program Design Build II -- RFI(2)
Results

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Fiesta Village Street - Onsite Improvement Plan
Renovation
Construction
$250,000 est. value
Mesa, AZ 85210

Big O Tire
New Construction - 6,794 SF
Construction
Laveen, AZ 85339

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

Residence Inn / Gilbert
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Gilbert, AZ 85234

Last Updated 08/17/2022 04:35 PM
Project Title

ADOT Wickenburg Truck Barn, Admin Building, and Fuel Island

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85004   (Maricopa County)
Category(s) Commercial, Government/Public, Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Gas Station, Misc. Buildings, Misc. Structures, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $9,069,287 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

*As of August 17, 2022, a general contractor has been awarded. Job Number: 19-060, 900418 The State of Arizona Department of Transportation (Department), has a requirement for construction services for a truck barn, admin building, and fuel island in Wickenburg, Arizona. The project consists of two new single story buildings of masonry construction; the Admin Building (4,103 SF), the Truck Barn & Storage (7,922 SF), a new Fuel Island, and upgrades to the existing site to facilitate use of the new structures. AZDOT - ADOT Wickenburg Truck Barn, Admin Building, and Fuel Island Addendum #1-#7 have been issued as of 4-11-2022. Note from FCI Constructors: Questions are due 3-8-2022 Owner issued RFI responses have been issued of as 3-8-2022. Q&A document has been issued as of 3-18-2022.

Details

,, 12,025 SF - 4,103 SF. 7,922 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Protective Covers, Transportation Stop Shelters.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents