Similar Projects
Central Plant Renovation, High Desert State Prison
Alteration
Bidding
$7,300,000 est. value
NV

AV System for the Fire Administration Building Emergency Operation Command Center
Alteration
Bidding
North Las Vegas, NV

Telecommunications Infrastructure Testing Services - Worldwide
Post-Bid

Fiber Optic Cable Installation
Post-Bid
NV

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Video Production Equipment and Installation
Term Contract
Bidding
Las Vegas, NV 89154

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

Support Services Building Roofing Replacement
Results
Henderson, NV 89011

Fume Hood
Post-Bid
Las Vegas, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

UNLV CBC-C 1st and 2nd Floor Repipe
Results
$820,000 est. value
Las Vegas, NV 89154

45--Supply and Replace HVAC Units
Post-Bid
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

Roofing Replacement
Results
$282,000 est. value
Las Vegas, NV 89121

Reported 09/17/2021 12:00 AM
Project Title

Replace HVAC Components, Roof, and Security Walter Johnson Junior High School Academy of International Studies

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89145   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing, Security/Communications
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $7,614,477
Plans Available from Copy Center - 08/23/21
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of scope to replace heating, ventilation, air conditioning components and roof, specifically: replace exhaust fans, controls, low slope membrane roof system, air handling units, constant volume air handling units serving the gymnasium, ductwork installation where damaged at dampers and cooling towers and associated pumps, boilers and associated pumps. Work also includes refurbishing some pumps, miscellaneous work as outlined in assessment, air vents on chilled/heating water piping, ductwork cleaning, chilled/heating/condenser water filtration, main shutoff valves for chilled/heating water systems and piping inspection and testing

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents