Similar Projects
Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Pepper Woods
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Latham, NY 12110

Pepper Woods
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Latham, NY 12110

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sam's Club #6440-209 - Fuel Station / Latham
New Construction, Infrastructure
Post-Bid
$1,250,000 CJ est. value
Latham, NY 12110

Snow Management Services Zone A
Term Contract
Post-Bid
Albany, NY 12243

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)
Results
$500,000 to $1,000,000 est. value
Albany, NY 12203

Forest Road and Francis Avenue Intersection Improvements
Results
Schenectady, NY

2022 Water and Sewer Improvements
Infrastructure
Construction
$3,337,172 CJ est. value
Albany, NY 12210

2022 Water and Sewer Improvements
Infrastructure
Construction
$3,337,172 CJ est. value
Albany, NY 12210

South Pearl Street Group Living Shelter Addition
Addition, Demolition, Infrastructure - 30,972 SF
Pending Verification
$5,000,000 CJ est. value
Albany, NY 12202

Sherwood Estates Conservation Subdivision
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Latham, NY 12110

Multi-Use Path along Cherry Avenue Extension - Town of Bethlehem
Infrastructure
Conception
$1,569,530 est. value
Bethlehem, NY

Last Updated 03/10/2023 08:36 AM
Project Title

McKownville Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Guilderland, NY 12084   (Albany County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work is generally described as follows: General Construction: Base Bid and three alternates work includes equipment, labor and materials to construct approximately 7,623 LF of new HDPE storm sewer, 56 drainage structures, 6 yard drains, 4,671 LF of storm laterals, asphalt pavement removal and replacement, & site restoration. Contract Documents, including Advertisement For Bids, Information For Bidders, Labor and Employment, Additional Instructions, Bid Documents, Agreement, General Conditions, General Requirements, Specifications, Contract Drawings and any Addenda, may be examined at no expense on line at the following website or at the office of Delaware Engineering, D.P.C., 28 Madison Ave Extension Albany NY, 12203. Any Bidder who submitted completed Bid Forms to the Town of Guilderland, upon returning such set in good condition within thirty days following the award of the contract or rejection of the bids, will be refunded his full payment. Deposits will not be refunded to any non-bidder (including material suppliers, subcontractors, or those that provide quotes to Bidders). Questions should be sent to Biagio DelVillano via email at bdelvillano@delawareengineering.com or Fax at (518) 452-1335. Please note that is the designated location and means for distributing and obtaining all bid package information. All Bidders are urged to register to ensure receipt of all necessary information including bid addenda. All bid addenda will be transmitted to registered plan holders via email and will be available . Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use and coordinate directly with REV for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within forty-five (45) days after the actual date of opening thereof. The right is reserved to waive any informalities in the Bid and to reject any or all Bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents