Similar Projects
St. Benedict's Episcopal School
New Construction - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Smyrna, GA 30080

The Stonehaven School
New Construction - 4,500 SF
Design
Marietta, GA

Bowdon High School Building Addition and Renovations
Renovation, Addition - 18,326 SF
Bidding
Less than $5,250,000 est. value
Bowdon, GA 30108

SCHS Tennis Courts
New Construction
Bidding
Sylvania, GA 30467

Jeff Davis High School Interior Renovations
Renovation
Post-Bid
$3,000,000 to $4,000,000 est. value
Hazlehurst, GA

Construction Management at Risk Services - K-12 Renovations, Modifications and Security Modifications
Renovation
Post-Bid
Less than $755,944 est. value
Georgetown, GA

Construction Manager at Risk Lagrange High School
New Construction
Results
Less than $675,000 est. value
La Grange, GA

Centennial and Roswell High Schools Renovations
Renovation
Results
Less than $5,099,412 est. value
Roswell, GA

King's Ridge High School West Classroom Addition
Addition - 30,166 SF
Construction
Alpharetta, GA 30004

Lassiter High School Gym Replacement
Construction
Less than $10,800,000 est. value
Marietta, GA 30066

Construction Time And Materials, And Miscellaneous
Renovation
Bidding
College Park, GA

Huntington Middle School Interior Cafeteria Design and Materials
Post-Bid
Less than $50,000 est. value
Warner Robins, GA 31088

A.Z. Kelsey Academy and Mainstay Academy Renovations and Modifications
Renovation
Results
Less than $5,790,000 est. value
Griffin, GA 30223

Construction Management at Risk Services for the Three Phased Projects
Construction
Less than $7,900,000 est. value
GA

Ben Hill Middle School Modifications
Renovation
Bidding
Fitzgerald, GA 31750

Reported 02/26/2021 12:00 AM
Project Title

Bremen High School Additions and Alterations

Physical Address View project details and contacts
City, State (County) Bremen, GA 30110   (Haralson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes a +/- 66,200 SF multi-story, conventional construction, steel-framed new replacement high school building with classroom instructional units, administrational suite, specialty labs, and specialty studios, along with the associated site development for the school and the partial phased demolition of the existing old high school. The project will be sprinkled. Work is scheduled to begin in early May 2021 with a final project completion date by May 2023

Details

1 Middle/Senior High School, 3 Stories Above Grade, 66,200 SF Addition.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 14 - Conveying Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents