Similar Projects
Southwest Water Treatment Plant - U22SWT - City Of North Port
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
North Port, FL 34287

South Tamiami Trail Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Sarasota, FL 34238

Whitaker Lofts
New Construction, Infrastructure - 24,096 SF
Design
$11,400,000 CJ est. value
Sarasota, FL 34236

Warm Mineral Springs Park Renovations
Infrastructure
Design
$300,000 CJ est. value
North Port, FL 34287

Quick Turn Around Rental Car Facility (Precast Bldgs and Overflow Lot) - BP 2
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Sarasota, FL 34243

Englewood Beach and Chadwick Park Pier Repairs
Infrastructure
Bidding
$76,600 CJ est. value
Englewood, FL 34223

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

PVC Pipe
Term Contract
Post-Bid
FL

Construction Services for Laurel Road Community Development
Results
FL

Fire Line Backflow Services
Term Contract
Results
FL

Hampton Manor of Venice
New Construction, Infrastructure - 63,300 SF
Pending Verification
$17,000,000 CJ est. value
Venice, FL 34285

New Hospital - City of Northport
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
North Port, FL 34287

Englewood Mixed Use Development
New Construction, Infrastructure
Conception
$39,200,000 CJ est. value
Englewood, FL 34223

Sarasota Station
New Construction, Infrastructure - 7,500 SF
Design
$20,100,000 CJ est. value
Sarasota, FL 34237

RFP Construction Manager at Risk - Public Services Facility Phase II
New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
North Port, FL 34287

Last Updated 08/31/2022 02:02 AM
Project Title

Health Department Chiller Lines

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34237   (Sarasota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

New Q and A End Date:Aug 10, 2022 5:00:00 PM EDT Project includes approximately 600 LF of dual 6-inch schedule 40 chilled water lines to extend underground from an existing system on the west side of School Avenue to an above grade stub location behind the Sarasota Health Department building. Two 2-inch conduits are also proposed within the trench of the dual 6-inch lines.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents