Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

Martha L. Miller Drive East Extension
Infrastructure
Results
Pleasant Hill, IA 50327

Des Moines Levee Alterations - Phase C
Infrastructure
Results
$14,200,000 est. value
Des Moines, IA 50982

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Homewood Suites by Hilton / Urbandale
New Construction, Infrastructure - 61,200 SF
Pending Verification
$18,000,000 CJ est. value
Urbandale, IA 50322

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Last Updated 06/16/2023 08:09 AM
Project Title

High Trestle Trail Transmission Main - Phase 1 - WTM-17-001 - City of Ankeny

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50023   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,365,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE : https://www.ankenyiowa.gov/home/showpublisheddocument/11407 Install approximately 9,900 LF of 24 transmission water main along the High Trestle Trail and abandoned railroad grade from the Ash Water Tower north to NW 18th Street and then west along NW 18th Street to NW Irvinedale Drive. This project will complete the 24 water main loop to the NW Booster Station. This project will be coordinated with a storm water project in the same area. Project is included City of Ankeny FY 2023 - 2027 CIP. Pg.No - 194. As of June 16, 2023, no new information available -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Install approximately 4,200 LF of 24 transmission water main along the High Trestle Trail and abandoned railroad grade from the Ash Water Tower north to NW State Street. This project will be the first phase of a two phased project to complete the 24 water main loop to the NW Booster Station. This project will be coordinated with a storm water project in the same area. The purpose of this project is to improve the performance and operation of our overall water system by allowing the Southwest and East pressure zones to be combined into one zone. This transmission main will allow the NW Booster Station to draw suction supply water from both water towers as needed once both phases are complete. This will supply the booster station with adequate water for full build out of the area in the northwest quadrant of Ankeny. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of March 2, 2022, a design engineer has been selected. Bidding is anticipated to take place late summer/early fall of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of April 19, 2023, no new information available

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents