Last Updated | 06/16/2023 08:09 AM |
Project Title | High Trestle Trail Transmission Main - Phase 1 - WTM-17-001 - City of Ankeny |
Physical Address | View project details and contacts |
City, State (County) | Ankeny, IA 50023 (Polk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,365,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | UPDATE : https://www.ankenyiowa.gov/home/showpublisheddocument/11407 Install approximately 9,900 LF of 24 transmission water main along the High Trestle Trail and abandoned railroad grade from the Ash Water Tower north to NW 18th Street and then west along NW 18th Street to NW Irvinedale Drive. This project will complete the 24 water main loop to the NW Booster Station. This project will be coordinated with a storm water project in the same area. Project is included City of Ankeny FY 2023 - 2027 CIP. Pg.No - 194. As of June 16, 2023, no new information available -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Install approximately 4,200 LF of 24 transmission water main along the High Trestle Trail and abandoned railroad grade from the Ash Water Tower north to NW State Street. This project will be the first phase of a two phased project to complete the 24 water main loop to the NW Booster Station. This project will be coordinated with a storm water project in the same area. The purpose of this project is to improve the performance and operation of our overall water system by allowing the Southwest and East pressure zones to be combined into one zone. This transmission main will allow the NW Booster Station to draw suction supply water from both water towers as needed once both phases are complete. This will supply the booster station with adequate water for full build out of the area in the northwest quadrant of Ankeny. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of March 2, 2022, a design engineer has been selected. Bidding is anticipated to take place late summer/early fall of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of April 19, 2023, no new information available |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |