Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

Saylorville Shoreline Erosion Protection Project
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Johnston, IA 50131

Martha L. Miller Drive East Extension
Infrastructure
Results
Pleasant Hill, IA 50327

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Homewood Suites by Hilton / Urbandale
New Construction, Infrastructure - 61,200 SF
Pending Verification
$18,000,000 CJ est. value
Urbandale, IA 50322

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Crescent Chase Pond / Drainageway - City of Johnston
Alteration
Design
$1,830,000 est. value
Johnston, IA

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Last Updated 05/31/2023 09:52 AM
Project Title

Northglen Stream Improvements - City of Johnston

Physical Address View project details and contacts
City, State (County) Johnston, IA 50131   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

www.cityofjohnston.com/DocumentCenter/View/7609/Section-4---Capital-Improvement-Plan-CIP The Northglenn neighborhood drains to a long grassed channel that runs parallel to a city bike trail on the southern side of the development. Since its construction, maintenance of this stream channel has been difficult due to standing water and pour overall drainage through the area. This project would address the area east of Merle Hay Road. Project is included City of Johnston FY 2020/2021 -2023/2024 CIP Page 46 As of May 31, 2023, no new information available ________________________________________________________________________________________________________________________________________________________________________ The Northglenn neighborhood drains to a long grassed channel that runs parallel to a city bike trail on the southern side of the development. Since its construction, maintenance of this stream channel has been difficult due to standing water and pour overall drainage through the area. This project would address the area east of Merle Hay Road. Project is included City of Johnston FY 2019/2020 - 2023/2024 CIP PAGE 88 As of August 14, 2019, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence in fall 2019. A timeline for construction has not been determined. The Northglenn neighborhood drains to a long grassed channel that runs parallel to a city bike trail on the southern side of the development. Since its construction, maintenance of this stream channel has been difficult due to standing water and pour overall drainage through the area. This project would address the area east of Merle Hay Road. This project is included in the City of Johnston FY 2019/2020 - 2023/2024 CIP and construction is planned for FY 2019/2020. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 11, 2022, no new information available

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents