Similar Projects
Beaver Creek Bank Stabilization
Infrastructure
Results
Less than $261,714 est. value
Urbandale, IA

Oleson Dr - RCB Culvert New - Single Box
Infrastructure
Results
$3,000,000 est. value
Bondurant, IA

2021 Saylor Creek Repairs and Restoration
Infrastructure
Results
$179,800 est. value
Polk City, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Martha L. Miller Drive East Extension
Infrastructure
Results
Pleasant Hill, IA 50327

Woodland Hills Greenway, Trail Construction and Drainage Improvements
Infrastructure
Results
$300,000 est. value
West Des Moines, IA

Corrugated Metal Pipes
Infrastructure
Post-Bid
Des Moines, IA

S-04 Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Johnston, IA 50131

South 35th and Grand Valley Culverts
Infrastructure
Results
IA 50265

MacRae Park Slope Stabilization Retaining Walls
Infrastructure
Results
Less than $1,200,000 est. value
Des Moines, IA 50315

Diamond Hills Greenway - Stream Repairs
Infrastructure
Bidding
$485,000 est. value
Ankeny, IA

Drainage District No. 12 Drainage Repairs
Infrastructure
Post-Bid
Bondurant, IA

Big Creek T Road Maintenance
Infrastructure
Results
Polk City, IA 50226

Slope Protection
Infrastructure
Results
IA

Ditch 2 Restoration - Bid Package 1
Infrastructure
Results
$391,740 est. value
Bondurant, IA

Last Updated 05/05/2022 06:49 AM
Project Title

Saylorville Shoreline Erosion Protection Project

Physical Address View project details and contacts
City, State (County) Johnston, IA 50131   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Tree clearing and grubbing for site access; installation of bedding stone and rip rap for the right descending bank the outlet channel and around into the uncontrolled spillway; bedding stone and rip rap placement of the main toe of the dam; replenishment of the access road along the main toe of the dam; bedding stone and rip rap placement along the eastern shoreline of the reservoir, bedding stone and rip rap placement along the western shore of the reservoir; installation of haul road access for material delivery and placement; site restoration. - The contract base consists of work along the right descending bank of the outlet channel and the main toe of the dam. - Option A: Consist of shoreline stabilization along the eastern shoreline of the reservoir. - Option B: Consist of shoreline stabilization along the western shoreline of the reservoir.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents