Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

Leonardo Drive - PW1617 - City of Carson
Infrastructure
Conception
$19,000,000 est. value
Carson, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cold Plane and Place HMA, Replace Guardrail and Curb Ramps
Infrastructure
Bidding
$11,400,000 est. value
Belmont, CA 94002

Cold Plane and Place HMA, Replace Guardrail and Curb Ramps
Infrastructure
Bidding
$11,400,000 est. value
Belmont, CA 94002

Tree Trimming Maintenance Service
Term Contract, Alteration
Post-Bid
$400,000 est. value
CA

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

Expo Center Roads Rehabilitation
Infrastructure
Results
$832,000 est. value
City of Industry, CA

Starbucks - East Highland Avenue / San Bernardino
New Construction, Alteration - 928 SF
Pending Verification
$300,000 est. value
San Bernardino, CA 92404

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Airport Avenue Improvements Project
Infrastructure
Bidding
$5,000,000 est. value
Santa Monica, CA 90405

Rapid Corridors San Pablo Avenue Project
Infrastructure
Post-Bid
Oakland, CA 94622

Reported 07/08/2022 12:00 AM
Project Title

Gold Stewardship IRSC

Physical Address View project details and contacts
City, State (County) Blairsden, CA 96103   (Plumas County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The objectives of this project are to promote healthy, diverse, fire-resilient forests, improve water quality and improve conditions in the Wildland Urban Interface by performing the following work across 157 acres: Cut and remove green sawtimber (10.0 inches to 29.9 inches DBH). Cut, skid and deck green biomass (3.0 inches to 9.9 inches DBH) material. Chip and haul biomass material, including tops and limbs from sawlogs to a cogeneration plant or other disposal site. Perform temporary road construction. Recontour entrances from Plumas County Rd. 519 into the project area. Permanently close temporary road access and spread logging slash within landings for erosion control. Provide traffic control. Re-contour newly constructed bench skid trails if awarded Re-contour newly constructed temporary roads if awarded. The cost for Item 1 has been appraised for in the timber value; therefore, separate payment for this work will not be made. Estimated volume of sawtimber is 6,644 tons and the volume of biomass is 5,999 tons.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents