Similar Projects
Reported | 07/08/2022 12:00 AM |
Project Title | Gold Stewardship IRSC |
Physical Address | View project details and contacts |
City, State (County) | Blairsden, CA 96103 (Plumas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Landscaping, Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description: The objectives of this project are to promote healthy, diverse, fire-resilient forests, improve water quality and improve conditions in the Wildland Urban Interface by performing the following work across 157 acres: Cut and remove green sawtimber (10.0 inches to 29.9 inches DBH). Cut, skid and deck green biomass (3.0 inches to 9.9 inches DBH) material. Chip and haul biomass material, including tops and limbs from sawlogs to a cogeneration plant or other disposal site. Perform temporary road construction. Recontour entrances from Plumas County Rd. 519 into the project area. Permanently close temporary road access and spread logging slash within landings for erosion control. Provide traffic control. Re-contour newly constructed bench skid trails if awarded Re-contour newly constructed temporary roads if awarded. The cost for Item 1 has been appraised for in the timber value; therefore, separate payment for this work will not be made. Estimated volume of sawtimber is 6,644 tons and the volume of biomass is 5,999 tons. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |