Similar Projects
Valencia ATS Apartment Complex
New Construction
Conception
Orlando, FL

AutoZone #5155
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Orlando, FL 32824

Pearl Eagles Boutique Hotel - Phase 2
New Construction - 67,402 SF
Design
Orlando, FL 32821

The Registry on Grass Lake
New Construction
Design
Winter Garden, FL 34787

Fairfield Inn & Suites by Marriott
New Construction - 59,500 SF
Post-Bid
Orlando, FL 32839

Collegiate Village - Phase I - Retail Buildings 1, 1A, 2
New Construction - 19,605 SF
Post-Bid
$5,000,000 est. value
Orlando, FL 32826

University Boulevard at Rouse Road Intersection Improvements
Results
$1,381,618 est. value
Orlando, FL 32800

Poitras East Master Infrastructure Phase 1C and Centerline Drive Segment F
Results
Winter Park, FL

City Center West Orange Apartments
New Construction - 323,000 SF
Construction
$18,000,000 est. value
Ocoee, FL 34761

Retail and Dental Office - Shell
New Construction - 5,100 SF
Construction
$650,000 est. value
Winter Garden, FL 34777

Amazon 4-Star / Orlando
Renovation
Pending Verification
$700,000 CJ est. value
Orlando, FL 32803

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Ace Hardware Store
Addition, New Construction - 16,000 SF
Conception
$4,225,000 CJ est. value
Horizon West, FL 34787

Fern Grove Senior Apartments - Phase 1
New Construction
Design
Orlando, FL 32808

O'Reilly Auto Parts (014) - Ultra Hub
Renovation - 29,276 SF
Post-Bid
$500,000 to $900,000 est. value
Orlando, FL 32804

Last Updated 04/25/2023 10:04 AM
Project Title

Floridian Town Center

Physical Address View project details and contacts
City, State (County) Apopka, FL 32712   (Orange County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Assisted Living Facility, Fitness Center, Hotel/Motel, Park/Playground, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Floridian Town Center project is expected to feature: 450-600 multifamily units, a 150-180 unit assisted living facility, 120 room hotel, and 200,000-290,000 square feet of retail space with an anchor grocer site, and a fitness center. As of October 2022, construction is underway. Information regarding an architect or general contractor have not been provided.

Details

290,000 SF - New Construction, New Construction. New Construction, New Construction. New Construction, New Construction. 290,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents